Founded in Singapore in 2O09,the Ten-League Group Corporation is a construction enterprise with EPC qualification for Building, municipal works,steel structure engineering, building decoration, MEP, and foundation engineering. The company is a large-scale comprehensive company integrating industrial and civil buildings,decoration, foundation, MEP, Landscaping,municipal transportation, highway and bridge, building intellectualization, building tomb walls and real estate development.
In recent years,with Singapore as the center, the Group has established many subsidiaries in Myanmar, Sri Lanka, Shanghai and Liyang.
Tang Dynasty Ceylon Construction Engineering (Pvt) Ltd
The company is registered under Sri Lanka Company Authority in 2O17 with a registered capital of (204号 { U S } 5$ million. The company was originally named Ten-League Construction Private Ltd. The company mainly focuses on Piling Construction, bridge structure, beam and slab prefabrication and installation,and machineryrental business, etc.
The company has strong technical force, complete mechanical equipment and advanced construction technology. The company has fixed assets of 10 million US dollrs,86 professionals technicians, and more than 300 employees. Can independently undertake large and medium-sized industrial, civil construction,municipal, highway and underground facilities and other complex construction tasks, with an annual total output value of more than 20 million US dollars.
The employees of Company not only have the spirit of hard work, but also have the spirit of ingenuity and innovation. The company has achieved one milestone after another within a few years after establishment. After trials and hardships, the company's employees are more and more mature and brilliant. Because every employee of the company has a sincere and spirits of hardship, believing in "striving constantly, developing continuously". We sincerely hope that our clients and customers will go hand in hand, cooperate together to share the success and brilliant future.
Organization Chart
Company Registration and Business Scope
FORM 2A ARTICLES OFASSOCIATION OF g x do TANG DYNASTY CEYLON CONSTRUCTION DEMOCRATICSOUFAKA ENGINEERING(PRIVATE)LIMITED Deigelpod 80 RuweuuaG PV 128997 No.of Compary 山 A.OBJECTIVES 2007 Te CoActNo7f2007 Subject to the provisions set out in the Sri Lanka Sri Lanka @ Exchange Control Act and its amendments, applicable provisions sle ofan Extra Ordinary Gazette Notification No.2045/56 dated PRIVATE COMPANY 17.11.2o17 and its amendments and other related provisions imposed by time to time,the companymay carry ona businessas CERTIFICATE OFINCORPORATION mentioned below: (5.noug) feygoame I.Toprovide construction&infrastructural services inaprofessional Punt Section5) manner oncivil construction.industrial construction and building oiddBisdgsif(Bog8oo construction such as,commercial & residential buildings,housing #井# complexes.hotel building construction,club.sehool, hospital
007 od building construction. residential building construction,road
ed construction and to engage in the other related services.
acnd tngo # i8o5 Sc Pom 2.To engage & provide services as interior designers,surveyors,civil L gL engineers. cost engineers,or quantity surveyors,mechanical
not spp engineers,electrical engineers,structural engineers,fire protection 国 engineers,town planners, developers, construction managers.
2 Raf Sm fabricators& erectors of steel buildings and steel structures and general contractors.
lherby ery TANG DYNASTY CEYLON CONSTRUCTION ENGINEERING(PRIVATE)LIMITED Companes Act 3.To provide world -class sustainable infrastructure facilityto
No.7of20de develophighly planed township for residential,retail,schools. Sestentesartayo lanta Eighteen hospitals,elubs and mixed commercial development and belt
Given under my hand atColombohis policy for infrastructure development activities. 4.To provide technical and engineering skilled manpower requirements to the construction projects. cedgdind t 5.To act as importers,exporters& wholesale traders on building Registar-Genral of Companies materials, building chemicals,latest Chinese heavy constriction machineries,equipments.pool equipment, accessories etc in compliance with theprovisions ofthe prevailing laws of the said Republic of Sri Lanka.
KEYEXPERIENCES
| No. | WorkContent&ProjectName | Main Contractor | Quantity (Nos) | Contract Period | ContractAmount | Completion Date | Quality |
| Pile Foundation Construction-Completed Projects | |||||||
| 1 | Pile foundation work of oil tankLOC Lanka projectinA3road | 150 | 9Month | 30,000,000 | 2007/2 | Excellent | |
| 2 | MainteancepilfodatonokangCsi | 622 | 10Month | 45,000,000 | 2007/12 | Excellent | |
| 3 | Pilefoundation workofNo.1-5 BridgeinhighwayA15 | CHEC | 150 | 23Month | 80,000,000 | 2010/2 | Excellent |
| 4 | PilefoundationworkofNo.3boiler and main workshopof PuttalamCMEC coal-power plant project | 531 | 16Month | 159,300,000 | 2011/3 | Excellent | |
| 5 | Precasricated expressway-Section4 | pistalaioutheChina Railway No.10 Bureau | 500 | 9Month | 42,500,000 | 2011/12 | Excellent |
| 6 | Pile foundation work of apartmentACCESS project in Colombo 10 | 105 | 7 Month | 23,500,000 | 2012/2 | Excellent | |
| 7 | Pilefoundation work ofCICT- ColomboSouthernPortProject | CHEC | 387 | 15Month | 270,900,000 | 2013/5 | Excellent |
| 8 | Pile foundation work of LongxiCHEC BuddhistCollegeinColombo | 235 | 9Month | 101,200,000 | 2014/12 | Excellent | |
| 9 | Pile foundation work of SouthernChina Railway No.5 Railway | Bureau | 200 | 15Month | 185,200,000 | 2015/6 | Excellent |
| 10 | Pile foundation work of expresswayChina Construction extension project -section3 | No.3Bureau | 132 | 13Month | 65,300,000 | 2017/8 | Excellent |
| 11 | Pilefoundationworkofcentral expresswayproject-section2 | ACCESS、ICC | 220 | 12Month | 125,000,000 | 2018/10 | Excellent |
| 12 | Test piles foundation work ofKTS project | CHEC | 2 | 2Month | 2,000,000 | 2018/10 | Excellent |
| Pile Foundation Construction-On Going Projects | |||||||
| 1 | PilefoundationworkofColombo port city development project- P4 &P5section | CHEC | 581 | 9Month | 270,000,000 | 2019/6 | |
| 2 | PilefoundationworkofMarine SquareProjectColombo-15 | ACCESS | 106 | 7Month | 68,900,000 | 2019/4 | |
| 3 | Pile foundation work of central expresswayproject-section2 | OlympicConstruction | 200 | 15Month | 203,000,000 | 2019/8 | |
| 4 | Pile foundationwork ofblue ocean apartment project inColombo 4 | BLUEOCEAN | 43 | 3Month | 35,500,000 | 2019/5 | |
| 5 | Pile foundationworkofKTS project | CHEC | 798 | 5Month | 602,100,000 | 2019/7 | |
KEYEXPERIENCES
| No. | WorkContent&ProjectName | MainContractor | Quantity | Contract | Contract Amount Completion Date | Quality |
Beam& SlabConstruction-Completed Projects
| 1 | Ibeamo OCH r istlation of | CHEC | 180 | 16Month | 44,550,000 | 2014/9 | Excellent |
| 2 | T beam precast of southern expressway extension project - section1.4 | China Aerospace Science and Technology Corporation | 436 | 9Month | 130,800,000 | 2017/6 | Excellent |
| 3 | Tbeamprecast&installationof southern expressway extension project-section1.3 | China Aerospace Science and Technology Corporation | 625 | 18 Month | 325,500,000 | 2018/3 | Excellent |
Civiland Decoration-CompletedProjects
| 1 | Affiliated worksof Hanbantota InternationalAirport | CHEC | 6Month | 22,500,000 | 2013/12 | Excellent | |
| 2 | AffiliatedProjectof Shangri-La HotelinHanbantota | CHEC | 5Month | 67,800,000 | 2016/05 | Excellent | |
| 3 | ColomboShangri-LaComplex Project | CHEC | 12Month | 168,000,000 | 2018/05 | Excellent | |
| 4 | Store&Warehouse in Colombo& Kandy | MINI SU | 3Month | 50,000,000 | 2018/03 | Excellent |
PileFoundation Construction-CompletedProjects
FromJune 2006 to February 2007,150 nos cast-in-place piles with a depthof20 meters and 4 0 0 {mm } diameter were constructed in Sri Lanka oil tank area by using the construction technology of rotary drilling pile machine.
FromMarch 2007 to December 2007,as subcontractor of the EPC contractor Shanghai Construction Company, we completed 622 foundation pit maintenance piles for the apartment building in Havelock City by using impact drilling technology.
From April 2008 to February 2010,as subcontractor of the EPC contractor China Harbour Engineering Company Ltd, we adopted 15-type impact pile construction technology to complete the construction of 150 punched cast-in-place piles with a depthof25 meters at 1 2 0 0 {mm } diameter and 40 meters at 1 5 0 0 {mm } diameter.
From December 2010 to March 2011,as subcontractor of the EPC contractor CMEC, we adopted 15-type impact pile construction technology to complete the construction of 531 punched cast-in-place piles with a depth of 25 meters at 6 0 0 {mm } diameter and 40 meters at 8 0 0 {mm } diameter.
From April 201l to December 201l,as subcontractor of the EPC contractor China Railway No.1O Bureau, we adopted prefabrication technology of hydraulic stress and hydraulic hammer construction technology to complete the construction of in total 5 0 0 0 { m } size 4 0 0 {mm } (204号 \ast _ { 4 0 0 {mm } } prefabricated piles.
FromMarch2012 to May 2013,as subcontractor of the EPC contractor China Harbour Engineering Company Ltd, we adopted Reverse circulation mode of hydraulic percussion drill and mud purifier construction technology to complete the construction of381 punched cast-in-place piles with a depth of 26 meters at 1 1 0 0 {mm } diameter.
The project is land reclamation by sea sand.Originally it was designed asthe construction scheme of al-steel retaining barrel. The company proposed to adopt the construction scheme of mud purification reverse circulation mode. The cost of steel retaining barrel was successfully saved by 25 million RMB for the owner.
From April 2014 to December 2014,as subcontractor of the EPC contractor China Harbour Engineering Company Ltd, we adopted 15-type impact pile construction technology to complete the construction of 235 punched cast-in-place piles with a lepth of 20 meters at 6 0 0 {mm } , 8 0 0 {mm } ,900mm,1200mmdiameter.
From April 2014 to June 2015,as subcontractor of the EPC China Railway No.5 Bureau, we adopted Sany SR280LGH Rotary Drilling Rig with Desilter construction technology to complete the construction of 2O0 punched cast-in-place piles with a depth of 35 meters at 1 0 0 0 {mm } diameter. The project location Rock hardness over 80Mpa.
From August 2016 to August 2017, as subcontractor of the EPC China Construction No.3 Bureau, we adopted SK200-type impact pile construction technology to complete the construction of 132 punched cast-in-place piles with a depth of 10-20 meters at 1 2 0 0 {mm } ,1500mm,1800mm diameter.
From November 2017 to October 2018,as subcontractor of the EPC Access& ICC. we adopted SK200-type impact pile construction technology to complete the construction of 220 punched cast-in-place piles with a depth of 10-20 meters at 1 2 0 0 {mm } ,1500mm,1800mm diameter.
Test piles foundation work ofKTS project
From September to October 2018,2013,as subcontractor of the EPC contractor China Harbour Engineering Company Ltd, we adopted QY350 full hydraulic reverse circulation drilling Rig with Desilter construction technology to complete the construction of 1 punched cast-in-place piles (test pile) with a depth of about 30meters at 6 0 0 {mm } diameter, 1 punched cast-in-place piles(test pile) with a depth of about 30meters at 6 0 0 {mm } diameter.
From October 2018 to now, as subcontractor of the EPC contractor China Harbour Engineering Company Ltd, we adopted XuGong XR400E Rotary Drilling Rig with Desilter construction technology to complete the construction of 90 punched cast-in-place piles with a depth of 16 meters at 1 8 0 0 {mm } diameter.
Pilefoundationworkof Colomboportcity developmentproject -P4&P5section
From October 2018 to now , assubcontractoroftheEPC contractor China Harbour Engineering Company Ltd, we adopted Sany SR280LGH Rotary Drilling Rig & XuGong XR400E Rotary Drilling Rig with Desilter construction technology to complete the construction of150 punched cast-in-place piles with a depth of 26metersat 9 0 0 {mm } diameter.
The project is 581 punched cast-in-place piles in total.
From June 2018 to now, as subcontractor of the EPC contractor Olympic Construction Company, we adopted Sany SR280LGH Rotary Drilling Rig & SK200-type impact with Desilter construction technology to complete the construction of 105 punched cast-inplace piles with a depth of 20 meters at 1 0 0 0 {mm } diameter. The project is 200 punched cast-in-place piles in total.
From February 2019 to now,,as subcontractor of the EPC contractor Blue Ocean Group of Companies, The project scale is 13 floor, 5 floor parking lot and 8 floor apartment building, 56 piles in total. we adopted QY40o full hydraulic reverse circulation drilling Rig with Desilter construction technology.
2013 From June 2013 to September 2014,as subcontractor of the EPC contractor China Harbour Engineering Company Ltd, we have complete the construction of precast & installation of18o I-beam of five overpasses, with a qualified rate of 100 %
From October 2016 to June 2017,as subcontractor of the EPC contractor China Aerospace Science and Technology Corporation, we have complete the construction of precast of 321T-beam of of Bridge, with a qualified rate of 100 %
October 2016 and March 2018,as subcontractor of the EPC contractor China Aerospace Science and Technology Corporation, we have complete the construction of precast & installation 4 6 0 { T } . -beamofBridge,witha qualified rateof 100 %
From July 2013 to December 2013,as subcontractor of the EPC contractor China Harbour Engineering Company Ltd, we have complete the construction of culverts and drainage systems.
FromJanuary 2016 to May2016,as subcontractorof the EPC contractor China Harbour Engineering Company Ltd, we have complete the construction of swimming pool, lobby, wall building, etc.
From May 2017 to April 2018,as subcontractor of the EPC contractor China Harbour Engineering Company Ltd, we have complete the construction of structural masonry project of the second-phase apartment and the third-phase complex of the project, and assists the general contractor to successfully complete the project, which has won the unanimous praise of the owners and contractors.
From January 2018 to March 2018, as contractor of the investorMini su company, responsible for the hydroelectric & decorationworks of stores& warehouses in Colombo, stores& warehouses in Kandy. It completed the decoration with high quality in a short period, and was praised by investors.
1 Set of Sany SR280LGH Rotary DrillingRigwith diameter (600,800,900,1000,1200,1500) mm bore bit.
4 Set of XuGong XR400E Rotary Drilling Rig with diameter (800,900,1000,1200,1500,1800) mm borebit.
QY象列履带式反循环全液压钻机主要用于小中大口径、大深度、复杂地层的桩基础施工,特别适用于砂、卵石及岩层施工。该系列钻机最大钻孔直径为3m,最深深度为150m,可在硬度100mPa以内的岩石层施工,广泛用于陆上建筑、水井钻孔、港口码头、江、河、湖、海中的桥梁等桩基础施工。
3Set of QY35O full hydraulic reverse circulation drilling Rig with diameter (600,800,900,1000,1200,1500) mm bore bit. 1 Set of QY400 full hydraulic reverse circulation drilling Rig with diameter (600,800,900,1000,1200,1500) mm bore bit.
| Po deprth | Min beis | (T) | Deptty | Pec | Bory | |||
| Ch2000 | 600 ~ 2200 | 80 | KLS(A) | 6 | JE2 | 56 | 7200-2000–72000 | 9500 |
12Set ofSK200-type impact with
diameter
(400,600,800,1200,1500,1800)
mmbore bit
2 SetofGPS15&GPS20with
diameter
(400,600,800,900,1000,1200,1500)
mm bore bit
\begin{array} { c } { { 2 { ~ S e t ~ o f } } } \\ { { 1 0 { ~ S e t ~ o f } } } \\ { { 8 { ~ S e t ~ o f } } } \\ { { 1 { ~ S e t ~ o f } } } \end{array} 75KW Cummins Generator
150KW Cummins Generator
250KW Cummins Generator
400KW Cummins Generator
A batch of concrete pouring hoppers, mud pumps, cutting machines, benders, varioustypesofconduitsandelbows.