INDUSTRIAL MANUFACTURING
Industrial manufacturing refers to the industry in the era of mechanical industry that utilizes certain resources (materials, energy, equipment, tools, capital, technology, information, and manpower, etc.) to transform them into large-scale tools, industrial products, and consumer goods that can be used and utilized by people through the manufacturing process in accordance with market requirements. The manufacturing industry is the mainstay of the national economy, the foundation of building a country, the tool for revitalizing the country, and the basis of a strong nation.
Indonesia Puqing Circular Technology Renovation Project
Bangpu Recycling Waste Battery Recycling Project
Henan Branch Bangpu Yihua Supporting Raw Materials and Iron Phosphate Engineering Project
Bangpu Yihua phosphogypsum and phosphate tailings transportation and pressure filtration project
Tencent Gui'an Seven Star Project
Permanent Electricity Project for the R&D and Production Base of Weitai Medical Blood Purification Products
PUBLIC BUILDINGS
Public buildings include office buildings (including office buildings, government department offices, etc.), commercial buildings (such as shopping malls, financial buildings, etc.), tourist buildings (such as hotels, entertainment venues, etc.), science, education, cultural and health buildings (including cultural, educational, scientific research, medical, health, sports buildings, etc.), communication buildings (such as postal, telecommunications, data centers, broadcasting rooms), transportation buildings (such as airports, high-speed railway stations, train stations, subways, bus stations, refrigerated warehouses, etc.), and others (police stations warehouses, detention centers, etc.).
REAL ESTATE DEVELOPMENT
Real estate development mainly refers to the preliminary work of housing construction, which can be divided into two situations:
One is the development of new district land, which means transforming agricultural or other non urban land into urban land suitable for industrial and commercial use, residential housing, commercial housing, and other urban purposes;
The second is the renovation or secondary development of old urban areas, which refers to the demolition of existing buildings and the reconstruction of land that is already urban land due to changes in land use, urban planning, and other reasons, and the investment of new labor.
Guangfo Company's Shabu Project integrates 6 transformer and distribution projects
MAIN PERFORMANCE TABLE OF THE COMPANY
| PROJECT NAME | PRODUCT MODEL |
| Guangzhou Water Supply Company's Permanent Power Supply Project - Huangpu Pressure Station Clean Water Tank Construction Project | GCK |
| Yuhu Cold Chain (Jieyang)International Food Trading Center Project Substation and Distribution Engineering | KYN/GCK |
| Hengyun Guangzhou Zhongxin Knowledge City New Energy Storage Demonstration Project | KYN/Transformer/GGD |
| Indonesia Puqing Circular Technology Renovation Project | GGD/XM/XGN/Transformer+Bus Bridge |
| Guangzhou Lihong Garden Project | XGN/GCK/XL |
| Hainan Poly Peninsula No.1 A12 Plot | KYN/GCK/XM |
| Luofeng Old Village Renovation Project | XGN/KYN/GCK/XM/GGD/DC screen |
| Xinghe Huafu Project | XM |
| Bangpu Recycling Waste Battery Recycling Project | GGD/XM/KYN |
| Henan Branch Bangpu Yihua Supporting Raw Materials and Iron Phosphate Engineering Project | KYN/GCK/GGD/HXGN |
| Bangpu Integrated New Energy Industrial Park - Bangpu Era Lithium ion Battery New Materials Project | KYN/GCK |
| Guangfo Company's Shabu Project integrates 6 transformer and distribution projects | KYN/XGN |
| Industrial Wastewater Treatment Project of Phosphorus Chemical Industry Park in Yichang City, Hubei Province | MNS(GCK) |
| Pingnan Times New Materials Technology Co., Ltd | KYN/GCK |
| Guangzhou Second Workers' Cultural Palace Overall Renovation Project | KYN/GCK |
| High and Low Voltage Power Distribution Project of Guangzhou Airport Expressway Baiyun Service Area (East District) Construction General Contracting Project | KYN/GCK |
| Bicun Old Village Renovation Project | GCK/XGN/XM/meter box |
| New 3x800kVA Temporary Power Supply Project for Nanxiangyaju in Zengcheng Development Zone | Box Transformer/Distribution Box |
| Guangdong Bangpu Circulation Global R&D Center and Innovation Headquarters - Distribution Installation Project for Distribution Room in Production Area | KYN/GCK/DC screen |
| Tencent News Gui'an Seven Star Project | XM |
| Capacity Expansion Project of Guangzhou Shangwei Daily Necessities Co., Ltd | GCK/KYN/DC screen |
| Poly Dongcheng Old Village Renovation Project | XGN/KYN/GCK/electric meter box/box transformer |
| Bangpu Yihua phosphogypsum and phosphate tailings transportation and pressure filtration project | KYN/GGD/DC screen |
| Permanent Power Supply Project for Junhui Science and Technology Innovation Center in the Greater Bay Area | XGN/KYN/GCK |
| Guangzhou Nord Cloud City Project | KYN/XGN/GCK/Meter Box |
| Guangzhou Company City Light Project | Electric meter box |
| Guangzhou Shiyuan Innovation Technology Co.,Ltd.- Permanent Power Supply Project or Interactive Intelligent Display and Control Products Intelligent Manufacturing Base | KYN/GCK |
| Guangdong Taikoo Coca Cola Co., Ltd. Greater Bay Area Intelligent Green Production Base Temporary Power Design and Construction Project | Box transformation |
| Guangzhou Gaoxinxing Communication Co., Ltd. newly installed 4 × 1600kVA+2 × 1250kVA+2 × 1000kVA specialized transformer power project | XGN/KYN/GCK |
| Power Supply Project of Guangzhou Zhongjian Xingguang City Project | XM |
| Permanent Power Supply Project for the Demolition and Resettlement Land of Chebei Collective Property in the Starting Area of Financial City | KYN/GCK/XGN |
| Aofei Silicon Valley Project | XM |
| Permanent Electricity Project for the R&D and Production Base of Weitai Medical Blood Purification Products | KYN/GCK |
| Ningde Bangpu New Materials Industrial Park Project | GGK/GGD/KYN/XM |
| LG Chem (Guangzhou) Engineering Plastics Co., Ltd. Photovoltaic Power Station Project | KYN/Box Transformer/System/Busbar Bridge |
| Guangzhou Meizhi Distributed Comprehensive Control Platform Innovation Center | Authorization box |
| Electric Power Construction Real Estate Shenzhen Mingyue Peng Project Power Supply Engineering | Electric meter box |
| Yihai Kerry (Guangzhou)Food Industry Co., Ltd. Temporary Electricity Capacity Expansion Project | Box transformation |
| Poly Shangchen External Power Engineering | Electric meter box |
| Wuzhou Fengda Mining Co., Ltd. 10kV Power Distribution Project | KYN/GCK/XGN |
| Guangzhou University of Science and Technology Power Distribution Engineering | KYN28、GCK |
| JD 2021- Phase Il Substation and Distribution Project of JD Asia No.1 Guangzhou Huadu Project | KYN/GCK |
| Hunan Bangpu Recycling Technology Co., Ltd. Project | GCK |
| Permanent Power Supply Project for Guangzhou Experimental Middle School | KYN/GCK |
| Shun'an Stone Factory Project | KYN/XGN |
| International Biomedical Innovation Center Project | KYN/GCK |
| Permanent Power Supply Project for Qiaofeng Commercial Building | KYN/GCK |
| Supply and installation of high and low voltage distribution equipment for Guangzhou Green Leaf Biomedical Industry Park project | KYN/GCK |
| Poly Nanyi Bay Project | XM |
| Tencent Huailai Ruibei Cloud Computing Data Center Project | XL、XM |
| Digital Ceramic Assembly Manufacturing Base | GCK/XL、XM |
| Guangzhou Baiyun (Tangxi Station) Station Front Engineering and Comprehensive Maintenance Area Comprehensive Building Project for the New Guangzhou Railway Hub | XL、XM |
| Foshan Greenland Color Tube Factory Brilliant Tiancheng Project | XL、XM |
| Dongguan Greenland Mansion Project | XL、XM |
| Foshan Greenland Water Fragrance Tree Garden Project | XL、XM |
| The permanent power supply project for the southern area of the Aite City project | XM |
| Photomask project for semiconductor applications in Guangzhou ZhongxinKnowledge City | XM |
| PermanentElectricityEngineeringfor the Procurement Project ofSurveyingandMappingGeographicInformationProduction Base ofGuangdongProvincialnstitute of LandandResources SurveyingandMapping | KYN、GCK |
| Guangzhou Boji Biomedical Technology Park Phase II (Low Voltage) Power Distribution Project | GCK、XM、XL |
| Zhongshan Bailingda Electronics Co., Ltd | XL、XM |
MAIN CONFIGURATION TABLE OF LOW-VOLTAGE ELECTRICAL SYSTEM
| 1 | Transformer capacity Sn (kVA) | 100 | 125 | 160 | 200 | 250 | 315 |
| 1 | Rated current oftransformer In (A) | 144 | 180 | 231 | 289 | 361 | 455 |
| 0.4kVlow pressureDistributiontransformerCableOr motherWire duct | 0.4kV cable phase linesection ZRYJV | 3(1×95) | 3(1×120) | 3(1×185) | 3(1×240) | 3(2×(1×150)) | 3(2×(1×185)) |
| 0.4kV cable N-wiresection ZRYJV | 1×50 | 1×70 | 1×95 | 1×120 | 1×95 | 1×185 | |
| 0.4kV bus duct | 1 | 1 | 1 | 1 | 1 | 1 | |
| lowpressureIncomingcabinet | 0.4kV busbar copper busbar | 50×5 | 50×5 | 50×5 | 50×5 | 50×5 | 60×6 |
| 0.4kV busbar N/PE/PENcopper busbar | 40×4 | 40×4 | 40×4 | 40×4 | 40×4 | 50×5 | |
| Instantaneous setting current | (8~12) In | ||||||
| Short delay setting current | (3~5) In | ||||||
| Short delay settingcurrent time setting (S) | 0.1~0.4 | ||||||
| Long delay setting current | (1~1.1) In | ||||||
| Long delay settingcurrent time setting (S) | 3~15 | ||||||
| Measuring currenttransformers | 200/5 | 250/5 | 300/5 | 400/5 | 500/5 | 600/5 | |
| Surge protector (Class I) | Uc≥253V, limp≥12.5kA (10/350μs), Level 4P or 3P, Up≤2.5kV | ||||||
| Fuse (Surge Protector) (A) | 80 | ||||||
| lowpressureCompensationcabinet | Knife melting switch | Require the rated current of the switch to be atleast 1.5 times the compensating current | |||||
| Measuring currenttransformers | Select according to the correspondingreactive power compensation capacity | ||||||
| Compensation capacity | When calculation conditions are not available, it is advisable to configureaccording to 20%-40% of the capacity of the distribution transformer | ||||||
| Surge protector (Class II) | Uc≥253V, In≥5kA (8/20μs), Level4P, Up≤2.5kV | ||||||
| Fuse (Surge Protector) (A) | 32 | ||||||
| notes | The selection of cable and copper bar cross-sections in this table refers to the basic data ofcurrent carrying capacity in the "Industrial and Civil Power Supply and Distribution DesignManual Volume 4". This table is a recommended configuration table for low-voltage | ||||||
| 400 | 500 | 630 | 800 | 1000 | 1250 | 1600 | 2000 | 2500 |
| 577 | 722 | 909 | 1153 | 1443 | 1804 | 2309 | 2887 | 3609 |
| 3(2×(1×240)) | 3(3×(1×185)) | 3(3×(1×185))3 | (4×(1×240)) | 1 | 1 | 1 | 1 | 1 |
| 1×240 | 3×(1×150) | 2×(1×85) | 2×(1×240) | 1 | 1 | 1 | 1 | 1 |
| 1 | 1000A/4P | 1250A/4P | 1600A/4P | 2000A/4P | 2500A/4P | 3150A/4P | 4000A/4P | 5000A/4P |
| 60×6 | 80×8 | 80×8 | 80×10 | 100×10 | 2×(100×8) | 2×(120×10) | 3×(100×10) | 3×(120×10) |
| 50×5 | 60×6 | 60×6 | 80×8 | 80×8 | 100×8 | 120×10 | 2×(100×8) | 2×(100×10) |
| (8~12) In | ||||||||
| (3~5) In | ||||||||
| 0.1~0.4 | ||||||||
| (1~1.1) In | ||||||||
| 3~15 | ||||||||
| 700/5 | 1000/5 | 1200/5 | 1500/5 | 2000/5 | 2500/5 | 3000/5 | 4000/5 | 5000/5 |
| Uc≥253V, limp≥12.5kA (10/350μs), Level4P or3P, Up≤2.5kV | ||||||||
| 80 | ||||||||
| Require the rated current of the switch to be at least 1.5 times the compensating current | ||||||||
| Select according to the corresponding reactive power compensation capacity | ||||||||
| When calculation conditions are not available, it is advisable to configure accordingto 20% -40% of the capacity of the distribution transformer | ||||||||
| Uc≥253V, In≥5kA (8/20μs), Level4P, Up≤2.5kV | ||||||||
| 32 | ||||||||
| electrical systems in user distribution stations (for reference only). User selection should be verified and calculated according to the actualenvironment. It is recommended to use bus duct connection for the line from 800kVA and above transformers to low-voltage incoming cabinets,and cableconnection for the line from 630kVA and below transformers to low-voltage incoming cabinets. | ||||||||
| Size and current carrying capacity table of commonly used copper bars | ||||
| Copper busbarcross-section | 25℃ | 35℃ | ||
| Flat (A) | Vertical placement (A) | Flat (A) | Vertical placement (A) | |
| 15*3 | 176 | 185 | ||
| 20*3 | 233 | 245 | ||
| 25*3 | 285 | 300 | ||
| 30*4 | 394 | 415 | ||
| 40*4 | 404 | 425 | 522 | 550 |
| 40*5 | 452 | 475 | 551 | 588 |
| 50*5 | 556 | 585 | 721 | 760 |
| 50*6 | 617 | 650 | 797 | 840 |
| 60*6 | 731 | 770 | 940 | 950 |
| 60*8 | 858 | 900 | 1101 | 1160 |
| 60*10 | 960 | 1010 | 1230 | 1295 |
| 80*6 | 930 | 1010 | 1195 | 1300 |
| 80*8 | 1060 | 1155 | 1361 | 1480 |
| 80*10 | 1190 | 1295 | 1531 | 1665 |
| 100*6 | 1160 | 1260 | 1557 | 1592 |
| 100*8 | 1310 | 1425 | 1674 | 1850 |
| 100*10 | 1470 | 1595 | 1865 | 2025 |
| 120*8 | 1530 | 1675 | 1940 | 2110 |
| 120*10 | 1685 | 1830 | 2052 | 2340 |
| 2(60*6) | 1126 | 1185 | 1452 | 1530 |
| 2(60*8) | 1460 | 1480 | 1503 | 1600 |
| 2(60*10) | 1680 | 1170 | 2140 | 2250 |
| 2(80*6) | 1320 | 1433 | 1705 | 1855 |
| 2(80*8) | 1651 | 1795 | 2117 | 2515 |
| 2(80*10) | 1950 | 2120 | 2575 | 2735 |
| 2(100*6) | 1564 | 1700 | 2000 | 2170 |
| 2(100*8) | 1930 | 2100 | 2470 | 2690 |
| 2(100*10) | 2320 | 2500 | 2935 | 3185 |
| 2(120*8) | 2140 | 2330 | 2750 | 2995 |
| 2(120*10) | 2615 | 2840 | 3330 | 3620 |
The calculation method of copper busbar current carrying capacity mainly includes the following steps:
Basic formula: Copper busbar current carrying capacity at 40 ℃=busbar width 9x thickness coefficient 9. The thickness coefficient varies depending on the thickness of the copper bar, for example, a 12mm thick copper bar has a coefficient of 20, a 10mm thick copper bar has a coefficient of 18, and so on.
Double layer copper busbar 9: Current carrying capacity=Single layer copper busbar current carrying capacity x1.56-1.58.
Three layer copper busbar 9: Current carrying capacity=Single layer copper busbar current carrying capacity x2.
Four layer copper busbar 9: Current carrying capacity=Single layer copper busbar current carrying capacity x2.45 (not recommended, it is best to use a non-standard busbar instead).
Temperature correction: The current carrying capacity of copper bars at 25 C is equal to the current carrying capacity at 40 C multiplied by 0.85.
Specific calculation example
Taking TMY100 \* 10 copper bar as an example, the specific calculation is as follows:
1. Single layer copper busbar current carrying capacity: 100mm width x 18 coefficient=1800A.
2. Double layer copper busbar current carrying capacity: 1800Ax1.58=2940A.
3. Three layer copper busbar current carrying capacity: 1800Ax2=3720A.
The above calculation results are quite close to the manual data.
| transformercapacity | High voltage coil D connected to 10kV | Low voltage coil y connected to 0.4kV | ||
| line current | Phase current | line current | Phase current | |
| 630 | 36.4 | 21.0 | 909.3 | 909.3 |
| 800 | 46.2 | 26.7 | 1155 | 1155 |
| 1000 | 57.7 | 33.3 | 1443 | 1443 |
| 1250 | 72.2 | 41.7 | 1804 | 1804 |
| 1600 | 92.4 | 53.3 | 2309 | 2309 |
| 2000 | 115.5 | 66.7 | 2887 | 2887 |
| 2500 | 144.3 | 83.3 | 3608 | 3608 |
| 3150 | 181.9 | 105.0 | 4547 | 4547 |
| D connection: Line current=Transformer capacity/High voltage/Root size3 Line current=Transformer capacity/High voltage/Root size 3Y connection: Phase current=Line current/Root number3 Line current=Phase current | ||||
| According to the writing standard for transformer connection groups, the letters for high-voltageconnection are capitalized, and the letters for low-voltage connection are lowercase,The connection method on the 10kV voltage side is the capital letter D connection, and theconnection method on the 0.4kV voltage side is the lowercase letter Y. | ||||
Guangzhou Gaobo Electromechanical Equipment Co.,Ltd QUALITY AND AFTER-SALES SERVICE COMMITMENTS AND GUARANTEE MEASURES
According to the technical document requirements provided by your side, we make the following commitments regarding the service of the electrical control project we are responding to:
Free warranty period: Two years
The free warranty period starts from the date of on-site acceptance of the equipment.
During the free warranty period, maintenance personnel will arrive within 4 hours in Guangzhou and 8 hours in Guangdong Province after receiving the repair notice.
1、Promise during the free warranty period:
1. Service organization: The company has an after-sales service department. After users install the company's equipment, the company establishes a user profile, provides long-term tracking services, and regularly maintains the equipment twice to three times a year to ensure uninterrupted service.
2. Emergency maintenance arrangement: If the user's equipment urgently needs repair, our company will send professional technical personnel to the site within 4 hours in Guangzhou for repair.
3. Maintenance service fee standard: Our company provides free on-site service for the distribution control equipment produced within one year, and lifetime warranty service after one year. Any damage to the equipment within one year (except for human and natural disasters) will be free of accessory fees and labor costs. If it cannot be repaired, the entire piece will be replaced free of charge. Damage caused by human factors and natural disasters will only incur accessory costs and not labor costs.
4. After the debugging is completed, our service technicians will provide detailed training and explanation of the equipment and its usage points to relevant users, and leave detailed equipment manuals or relevant technical drawings for future reference. Free on-site technical guidance and training will be provided irregularly to solve users' worries.
5. List of Maintenance Technicians
| full name | Department and Position | phone |
| Jiang Gong | Pre sales engineer | 18011965701 |
| Zhong Gong | After sales engineer | 18925140458 |
| Complaints Hotline | 18026315926 |
2、Promise after the free warranty period expires:
1. Lifetime provision of accessories and maintenance services (accessories are provided at factory prices, and maintenance services are only charged at hourly rates). If the warranty period expires and cannot be repaired, the entire item will be replaced at cost.
2. Our company gives priority to upgrading equipment for original users, and the upgrade fee is charged at cost. We will provide long-term free design of relevant power distribution construction plans for original users.
Guangzhou Gaobo Electromechanical Equipment Co.,Ltd




