长江口工程
针对土质密实度高、多为铁板砂,且疏浚量大,疏浚土运距远的特点,组织科技攻关:一是自行研制开发新型主动耙头,自行开发V2.0疏浚监控平台,提高施工效率;二是开展“疏浚土有益利用技术研究”和“吹泥上滩施工技术研究”,变废为宝,同时减少疏浚土远距离外海抛卸量,有效降低工程投资和施工成本;三是开展重大装备建造技术研究,如“16888m特大型耙吸挖泥船技术开发与研究”。
Changjiang Estuary Deepwater Channel Project
Asto the feature of high-density soil, vast majority of consolidated sand,large volume of dredging and long transporting distance of dredged soil, the company organized professionals totackle scientificand technological problems:firstly, enhance the working efficiency by independently developing the new active drag headand V2.0 Dredging Monitoring Platform;secondly, conduct studies on technology of beneficial utilization of dredged soil and technology of sand pumping ashore, to turn waste into treasure,reduce the long-distance dumping volume of dredged soil as well as cuting down the project investment and cost; thirdly, launch the technological research on the building of major equipment, such as technology development and research on ultra large scale TSHD with hopper capacity of 16888m².
Achieve the Finest Project With the Most Advanced Technology
以最前沿的技术,打造最优质的工程
Qingcaosha Reservoir Project
QingcaoshaReservoirProjectisthekeylivelihoodprojectwhichprovidesfinequalityofdrinkablefreshwaterfor10 millionShanghaicitizens.Thereservoirhastotalvolumeof526millonm³withthedikeaslongas48km.Theconstructionisverytrickywithmanytechnologydificutiesoneofwhichistheclosingofthemainclosuremouthof800m eastdike.It'sestimatedthattheflowspeedatthemouthisevenhigherthanthatofThreeGorgesDam.Through theschemecomparison,theshemeoflayinglargesteelframecagewaschosenandonJanuary2oo9,theclosure mouthwithwidthof8oometerswasclosedsuccessfullyatonestroke.
青草沙水库工程
目前国内最大的江心河口边滩水库,是解决上海市1000万人口优质饮用水的民生工程。库容量5.26亿m3,围堤总长度48km,施工难度大,需要解决的技术难题多,其中最大的难题就是东堤800米主龙口合龙问题,据测合龙流速将超过三峡大坝。通过方案比选,最终确定了大型型钢框笼安放及笼内抛石的龙口封堵方案,2009年1月2日,800米龙口合龙一举成功。
本工程总吹填量约2.5318亿m3;围堤长度20.296km,隔堤长度15.47km,总长度为35.766km;围海面积25.35km²;总工期为4年。整个工程采取分块、分阶段围海吹填的方式开发建设。
Phase ll Project of Tianjin Sea-front Industrial Area Reclamation Works
PaselProjetofnfrotustrreeclaatWoksiateteloaeeaofforeadatteaf RiverinTangGistrtictforeladtoheeastofthasePrjectOnthlutplatheastoundafa shownasstedatestortuditetinutc 100mtotheothndthethoudaristheetesoundaryleofsoutedmforaseroectetotleclamatilu is25 25.35kmadatiottaiedaaeedtsooo stage of Phase Il Project.
Here Tracing Out Our Ambitious Blueprint
在这里,描绘出我们雄心勃勃的蓝图
曹妃甸工程
在环渤海湾地区,率先在北方冰融地区引进袋装砂结构建造海堤的崭新工艺,成功建设曹妃甸18.477km长的通岛路路基,使唐山曹妃甸成功迎来首钢历史性搬迁
Caofeidian Project
Intheareaaroundthe BohaiBay,SDC took lead in introducinganew technicsofbuildingseawallsbyusingsandsackedbagsatacore inthe northernicemeltingregionof China,succeeded inbuildingan18.477 kilometersofcausewayfoundationinCaofeidian,whichsuccessfully contributetothehistoricmoveofCapital IronandSteelCompanyfrom Beijingto TangshanCaofeidian.
Lianyungang Port 300,000-DWT Channel Dredging Works
连云港港30万吨级航道疏浚工程
Lianyungang PortWaterway Engineering
Since 197Os, the company has started waterway plan and design for the channel of Lianyungang Port,and later undertook the design and plan for 50o0-300,0oo DWT channel project.
公司自20世纪70年代开始进行连云港港口航道水域规划研究和设计,承担了连云港港5000吨\~30万吨级航道工程的研究、设计工作。
连云港港航道工程
Yingkou Channel Dredging and Maintenance Project
营口航道维护疏浚工程
Foundation Treatment
地基处理
了天津临港工业区、天津南港工业区、温州民营经济科技科业基地滨海园区丁山垦区、苍南县江南海涂围垦区、台州东部新区启动区块吹填及软基处理工程等30余项软基处理工程,软基处理面积累计约30km²。
Duringrecentyears,SDChasundertakenover30softsoil foundation treatmentprojectsinTianjinSea-frontIndustrialArea,TianjinNangangIndustrialZone,BinhaiParkDingshanAreaofWenzhouPrivate-ownedScienceand TechnologyIndustrialBase,Cangnan JiangnanPolderarea,Start-upareaof EastTaizhouNewArea,etc.withtotalsoftsoiltreatmentareaof30km².
瓜达尔深水港项目建成后的瓜达尔港Gwadar Port after construction瓜达尔深水港项目采取分期建设,一期工程建成一个包括三个泊位兼顾滚装作业的多用途码头。
Gwadar Deepwater Port Project was built by stages, phase 丨 project completed as a multi-function port which includes three berths with roll-on& roll-off function
陆域纵深 8 0 0 { m } ,吹填造地总面积153.6万m²,吹填量796.5万 \mathsf { m } ^ { 3 } ,港区陆域面积63.9万 \mathsf { m } ^ { 2 } 。
The longitudinal distance of land forming area is 8 0 0 ~ { { m } } ,the total reclamation area is1,536,000 m ^ { 2 } .the reclamation volume is 7,965,000 { \mathfrak { m } } ^ { 3 } ,and the port land forming area is 639,000 \mathsf { m } ^ { 2 }
一期工程港池航道按3万吨散货船兼顾2.5万吨集装箱船疏浚,水域挖方量1463.2万 \mathsf { m } ^ { 3 } ,进港航道总长 4 . 2 4 k m 。
Phase丨projectforchannelandbasindredgingisfortheutityofoootonsbulkcargoand5tonscontainervsel,the dredging material is14,632,oo0 m³,and the total length of access channel is 4 . 2 4 k m
2007年2月巴基斯坦瓜达尔工程顺利完工,4月13日巴基斯坦瓜达尔港务局正式发出完工证明,中交上航局参与建设的我国建国以来最大对外援助工程圆满完成。
GwadarDeepwaterPortProjectinPakistan finishedsucefullyinFebruary2OO7,andtheoffcialcertificateofcompletionwas issuedbyGwadarPortAuthorityonApril13,2O07,whichmeansthatthebiggestprojectinaidofaforeigncountrysincethees tablishment of the People's Republic of China was well completed by SDC.