WA BUSINESS
METAL GUARDRAIL
SHANGHAI QINGE
METAL GUARDRAIL
PRODUCT SPECIFICATION INTRODUCTION
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
EDGE GUARDRAIL
PRODUCT
Temporary edge protection systems are used in construction work primarily to prevent people and objects
from falling to lower levels from roofs, edges, stairs, and other areas where protection is required.
In most European countries, temporary edge protection or other types of fall protection systems are required
when a risk assessment identifies a fall hazard, regardless of height. Unlike being secured with a lifeline,
guardrails provide greater mobility in the work area.
Remove snow and ice that can increase the load on the system. Barriers must never be covered with scaffolding netting or similar materials that affect wind loads.
Introduction
Remove snow and ice that can increase the load on the system.
Barriers must never be covered with scaffolding netting or similar
materials that affect wind loads.
Notice
Edge guardrail drawing
Post drawing Post & Expansion bolt
ACCESSORIES & DRAWING
EDGE PROTECTION
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
Accessories 1: fixed to the wall Accessories 2: fixed to the ground
1200
Post cap
Flange plae
Post: 40×40×1.5mm
L
H W L L
L: 1250/1500/2500 mm
W: 20 mm
H: 1050 mm
7 / 8 / 12.5 kg
Steel + Zn + Powder coating 160 mm
1 2
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
LIVE DEMONSTRATION
EDGE PROTECTION
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
Column misalignment installation, avoiding obstacles
Usage Precautions
• Regularly inspect the guardrail's connection points; if looseness is
found, tighten them promptly.
• Avoid impact from heavy objects on the guardrail to prevent
deformation and damage.
• If peeling of the guardrail's surface coating is found, touch-up
painting can be performed to extend its service life.
Prepare the required guardrail components, electric drill, expansion bolts, wrench, hammer, tape measure and other tools.
Ensure the construction area is clean and free of obstacles.
INSTALLATION MANUAL
EDGE PROTECTION
PRELIMINARY PREPARATION
USAGE PRECAUTIONS
Electric Drill
Hammer Steel Tape Measure
Drill Bit 12mm (15/32) Expansion Bolt 8mm (5/16)
Wrench 14mm (9/16)
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
INSTALLATION MANUAL
EDGE PROTECTION
1.Measure the length of guardrails that
need to be installed
2.Based on post positioning 3.Installation Display
4.Drill holes according to the post
spacing and place 4 expansion screws
6.Results Presentation 5.Hang the guardrail on the post
8.Adjust the overlap interval according
to the spacing
7.Hang the guardrail on the post 9.Results Presentation
4 4
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
Application scenarios
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
ELEVATOR SHAFT GUARDRAIL
ACCESSORIES & DRAWING
ELEVATOR SHAFT GUARDRAIL
Elevator shaft guardrail accessories
24 mm 8 mm
38 mm
15 mm 40 mm
25 mm 30 mm
10 mm
10 mm
40 mm100 mm
25 mm 3 mm
3 mm
3 mm100 mm
40 mm
Front
30 mm
10 mm
100 mm
40 mm
10 mm
30 mm
Side Back
160
2200
1700
20 / 30
150
75
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
ELEVATOR SHAFT GUARDRAIL
INSTALLATION MANUAL
ELEVATOR SHAFT GUARDRAIL
1.Drilling Positioning
In accordance with the design
specifications, use a tape measure to
determine the drilling positions and
mark them with a marker. Subsequently, drill holes at the marked locations
using an electric drill (see diagram).
2.Expansion Bolt Installation
Insert the expansion bolts into the
pre-drilled holes and tighten them with
a wrench.
3.Guardrail Frame Installation
Connect the guardrail connectors to
the expansion bolts, and secure them
using tools such as a wrench or
hammer (see diagram).
5.Overall Adjustment & Inspection
Inspect all installed components to
ensure secure connections, and verify
that the guardrail is vertically plumb
and horizontally level as a whole (see
diagram).
4.Guardrail Mesh Panel Installation
Align the guardrail mesh panels with
the connectors and proceed with the
installation (see diagram).
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
Risk Assessment
• Falling from height
• Falling hand tools
• Falling accessories
• Falling components
• Risk of ear and hand injury
• Operator errors during installation
Requirements and Preparations for Risk Mitigation
Mandatory requirements during installation:
1. Personal protective equipment (PPE) and protective gear must be used in accordance with applicable laws and
regulations.
2. All personnel installing the barriers shall use a fall arrest system for work at height, in compliance with the latest
work-at-height regulations and guidelines.
3. Only intact, suitable and purpose-built tools shall be used for the installation work.
4. The installation area and its immediate surroundings must be clearly marked and secured to prevent unauthorized
entry and movement of personnel.
5. Caution must be exercised against falling objects.
6. Components of the edge protection system shall be sourced exclusively SAFETY RESPECT. Any exception to this
condition must be approved by the manufacturer.
EN13374-B-STANDARD
Installation instructions For Fall Protection System
SAFETY INSTRUCTIONS FOR INSTALLATION
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
Support leg in European standard 1.1 with holes for overhead installation
1. Anchoring to the building floor for edge protection is standard.
2. 1. For concrete anchoring should use two units - 12X100 multiple concrete screw.
3. 3. Duty on the foot base to be in full contact with the concrete structure.
4. 4. Make sure the angular direction is facing.
SAFETY INSTRUCTIONS FOR INSTALLATION
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
Installation Instructions
1. Support Leg (European Standard 1.25) – for side connection
2. For side anchoring to the wall, applicable in scenarios requiring continuous work without dismantling the protective
restraints until the completion of the project.
3. This support leg enables uninterrupted internal finishing work, eliminating the need for repeated dismantling and
reassembly of the edge protection fence.
Concrete Anchoring Requirements
1. Use four 8*150 multi-purpose concrete bolts for concrete anchoring.
2. Ensure the base plate of the support leg is in full contact with the concrete structure.
3. Verify that the angle brackets are oriented inward.
4
4
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
Anchor Support Leg from Pressure 0.3 – Upper
1. In situations where it is not possible to anchor using concrete bolts, a clamping
foot can be used.
2. The clamping foot can be anchored to a concrete floor at least 15 cm high. 1.
3. After placing the clamping feet in the correct position, tightening should be
performed using the screw rod.
4. 3. Final tightening is performed using a hammer punch to close the screw.-
Make sure the angles are facing in.
Angular base for wall mounting
Angular base for wall mount, can be used when you want to use
a support foot in the European standard 1.1 with holes
1. Install overhead in favor of lateral anchoring.
2. At the base of the support foot there is an M16 ohm - for the
connection between it and the angular base one unit of 1
must be used.M16X40 hexagon screw (as illustrated).
3. For concrete anchoring you need to use two units - 3-fold
concrete bolt . 12x100.
4. Must on the basis of the angle be in full contact with the
concrete structure.
5. Make sure the angle direction is facial
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
SAFETY INSTRUCTIONS FOR INSTALLATION
Installation instructions For Fall Protection System
Angular base for wall mounting
1. Wall mounting accessories
2. For concrete anchoring should use two units - 12X100 multiple concrete bolt.
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
SAFETY INSTRUCTIONS FOR INSTALLATION
Installation instructions For Fall Protection System
1.Each barrier is secured by two tabs on each support leg.
2.The barrier should be attached to the support leg so that the tongues enter the gap between the wires of the net.
3.To continue the line of the barrier fence, an additional barrier can be attached to the support leg and create an
overlap between
The barriers (each corner of the support leg can lock up to two barriers in parallel).
4. (Note: The overlap between the blocking fields may increase according to the installation curve conditions).Minimum
clearance – 10 cm / Maximum distance of the support foot from the end of the barrier – 30 cm
Network/Frame(2.5 -2.6 / 1.9 -1.95 / 1.3)European standard end of
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
Corner Connection Accessories 360
1. Insert the support spider tab into the square of the accessory and thus form an angle.
2.Make sure the connection is on the inside so that the thrust is applied to the support leg and not to the tongue of the
accessory.
3. Make sure the angular direction is facing.
Installation at varying angles and angles
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
Can be mounted on H20 cores
1.Make sure that the lines installed in the vertical position are fixed and tightened well.
2.Place the beam at a minimum distance of 5 cm from its tip.
3.Hold the nation at the top of the support base (key/box 19’) until tightened
Full to the core.
European standard 1.1 support leg with wood base
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
Cap
Mesh
Overlap
Post
Base: See page outlining installations/anchoring of fence posts.
Clips for joining
mesh to mesh
Ferrule for fixing
mesh to pole
Strengthening
Girder
Zigzag mesh – Arrow
(Hetz) pattern
Cap
Post
Mesh
Strengthening Girder
Overlap
Height Mesh Post No. of ferrules No. of clips Posts’ centres
The above dimensions are in mm.
Type:
Security mesh fence for use as a physical obstacle
for perimeter fencing and generally demarcating
site boundaries. This fence is suitable for use as
erimeter continuous fencing of storage areas,
factories, agricultural lands,institutions, and similar.
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
L: 2500 mm
W: 40-60 mm
H: 630-2430 mm
Mesh size:200mm x 50mm
Steel + Zn + Powder coating
Feat ure• Easily Assembled, FSC, Pressure Treated
Timbers, Renewable Sources, Rodent Proof,
Waterproof
Usage• Garden Fence, Highway Fence, Farm Fence
Type:
Fencing, Trellis & Gates, security fence,
Driveway Gates, Fence Gates, Fence Hardware,
Fence Panels, Fence Posts, Fence Rails, chain
link fence, Fence Post Caps
Type:
Light mesh fence,suitable for use in
demarcating borders of landscaped gardens,
residential building,and similar
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE GUARDRAIL
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
STEEL FENCE
STEEL FENCE
PRODUCT
Prepare the required guardrail components, electric drill, expansion bolts, wrench, hammer, tape measure and other tools.
Ensure the construction area is clean and free of obstacles.
STEEL FENCE
PRODUCT
STYLE
ACCESSORIES SHOW
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
STEEL FENCE
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
CHAIN LINK FENCE
CHAIN LINK FENCE
PRODUCT
Ideal for: warehouse, industrial, security, residential, parks, playgrounds,court.
CHAIN LINK FENCE
PRODUCT
STYLE
ACCESSORIES SHOW
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
CHAIN LINK FENCE
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
3D WELDED WIRE MESH FENCE
3D WELDED WIRE MESH FENCE
PRODUCT
Mainly used for security protection in construction site,residential building, sports field, farm, warehouse, garden,highway or airport
service area, railway station, etc.
PRODUCT
STYLE
DETAILS
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
3D WELDED WIRE MESH FENCE
3D WELDED WIRE MESH FENCE
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
AUSTRALIA TEMPORARY FENCE
AUSTRALIA TEMPORARY FENCE
PRODUCT
Ideal for: construction,festivals and events,emergency service
PRODUCT
STYLE
ACCESSORIES SHOW
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
AUSTRALIA TEMPORARY FENCE
AUSTRALIA TEMPORARY FENCE
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE PROTECTION BARRIER
EDGE PROTECTION BARRIER
PRODUCT
Common usage scenarios of edge protection systems: commercial construction.
industrial construction,residential construction,infrastructure construction.
concrete edge protection, steel edge protection timber frames edge protection.
PRODUCT
STYLE
DETAILS
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
EDGE PROTECTION BARRIER
EDGE PROTECTION BARRIER
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
PALISADE FENCE
PALISADE FENCE
PRODUCT
Ideal for: yards, garden, airports, power plants &substations,petroleum & chemical facilities, factories
PRODUCT
STYLE
DETAILS
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
PALISADE FENCE
PALISADE FENCE
PHN/WA/WX: +86-133 1189 1208
RobertWang@pianoplywood.com
www.pianoplywood.com
Block F,Floor 8,NO.58,New JinqiaoRD,Pudong District,Shanghai 201206,China
Fax/Tel: +86-21-50792750
PIANOPLYWOOD WA BUSINESS
METAL GUARDRAIL
# QG020501 # QG020502 # QG020503 # QG020504
# QG020505 # QG020506 # QG020507 # QG020508
# QG020509 # QG020510 # QG020511 # QG020512
# QG020513 # QG020514 # QG020515 # QG020516
MORE STYLES TO SHOWCASE
EDGE PROTECTION
TEST REPORT
No.: SHIN2601000126CM01_EN Issue Date: 2026-01-29 Page:1 of 6
Signed for and on behalf of
SGS-CSTC Standards Technical Services (Shanghai) Co., Ltd.
Ziven Wang Authorized signatory
CUSTOMER NAME: SHANGHAI QIN GE CERAMIC & BUILDING CO., LTD.
ADDRESS: BLOCK F, 8/F, NO. 58, BOC EAST MANSION, NEW JINQIAO ROAD,
PUDONG, SHANGHAI 201206
Sample Name : Edge ProtectionGuardrails
Product Specification : 1050*1500*20MM
Material : Q235
Above information and sample(s) was/were submitted and confirmed by the client. SGS, however, assumes no
responsibility to verify the accuracy, adequacy and completeness of the sample information provided by client.
******************************************************************************************************************************
SGS Ref. No. : TJIN2601000013CM01
Date of Receipt : 2026-01-13
Testing Period : 2026-01-13 ~ 2026-01-29
Test result(s) : For further details, please refer to the following page(s)
(Unless otherwise stated the results shown in this test report refer only
to the sample(s) tested)
TEST REPORT
No.: SHIN2601000126CM01_EN Issue Date: 2026-01-29 Page:2 of 6
Summary of Results:
No. Test Item Test Method Result Conclusion
1
Test Item:
Serviceability Limit
State Toe Board
Level
With Reference to EN
13374:2025 Clause 6.3.2 &
Clause 7.4.2
See Result Pass
2
Test Item:
Serviceability Limit
State Toe Board
Level
With Reference to EN
13374:2025 Clause 6.3.2 &
Clause 7.4.2
See Result Pass
3
Ultimate Limit State,
Parallel
With Reference to EN
13374:2025 Clause 6.3.6 &
Clause 7.4.3
See Result Pass
Pass : Meet the requirements;
Fail : Does not meet the requirements;
Note:
N/A : Not Apply to the judgment.
Original Sample Photo:
Front View Back View
TEST REPORT
No.: SHIN2601000126CM01_EN Issue Date: 2026-01-29 Page:3 of 6
Column Assembly
TEST REPORT
No.: SHIN2601000126CM01_EN Issue Date: 2026-01-29 Page:4 of 6
1. Test Item: Serviceability Limit State Toe board level
Test Method: With Reference to EN 13374:2025 Clause 6.3.2 & Clause 7.4.2
Test Condition:
Specimen: 1503mm×1053mm×20mm (Length × Width × Thickness),1pc
Test load: 200N
Test Result:
Test Item Loading Type Test Result Client’s Requirement Conclusion
Horizontal
Loading
Deflection is 10.16mm Pass
Serviceability
Limit State
Toe board
level
Downward
Loading
Deflection is 0.63mm
Deflection≤55.00mm
Pass
Test Photo(s):
Horizontal Loading - In Test Downward Loading - In Test
TEST REPORT
No.: SHIN2601000126CM01_EN Issue Date: 2026-01-29 Page:5 of 6
2. Test Item: Serviceability Limit State Guardrails level
Test Method: With Reference to EN 13374:2025 Clause 6.3.2 & Clause 7.4.2
Test Condition:
Specimen: 1503mm×1053mm×20mm (Length × Width × Thickness),1pc
Test load: 300N
Test Result:
Test Item Loading Type Test Result Client’s Requirement Conclusion
Horizontal
Loading
Deflection is 37.25mm Pass
Serviceability
Limit State
Guardrails
level
Downward
Loading
Deflection is 0.16mm
Deflection≤55.00mm
Pass
Test Photo(s):
Horizontal Loading - In Test Downward Loading - In Test
TEST REPORT
No.: SHIN2601000126CM01_EN Issue Date: 2026-01-29 Page:6 of 6
3. Test Item: Ultimate Limit State, Parallel
Test Method: With Reference to EN 13374:2025 Clause 6.3.6 & Clause 7.4.3
Test Condition:
Specimen: 1503mm×1053mm×20mm (Length × Width × Thickness),1pc
Fmax=γtot×QK=333N (200×1.5/0.9)
Test Result:
Test Item Test Result Client’s Requirement Conclusion
Fmax=333N, there is no identifiable
yielding, fracture, sliding or separation
of any part of the assembly
Ultimate Limit
State, Parallel
Ultimate load=9.07kN, the specimen is
damaged
During the Fmax there
should be no identifiable
yielding, fracture, sliding
or separation of any part
of the assembly
Pass
Test Photo(s):
Fmax=333N - In Test Ultimate load - In Test
The test report shall only be used for clients’ scientific research, teaching, internal quality control,
product research and development, etc… and just for internal reference.
Unless otherwise stated, this report provides a declaration of conformity according to whether the test
results are within the specified limits or specifications without considering the measurement
uncertainty.
********End of report********
Fax/Tel: +86-21-50792750
Phone/WhatsApp/WeChat: +86-133 1189 1208
E-mail: RobertWang@pianoplywood.com
Add: Block F,Floor 8,NO.58,New Jinqiao RD,Pudong District,Shanghai 201206,China




