KEYIHARDWARESTAIR COLUMN SERIES科艺五金楼梯立柱系列
COMPANY PROFILE
科艺五金成立于1997年,是一家专业设计、生产楼梯立柱的企业。为加快公司的发展和适应市场的需求,促进技术的创新,2011年本公司在金陶工业区建设15000平方米的生产基地并投入使用。本公司拥有先进的生产设备,生产线。设有研发中心和检测系统。产品的性能必须经过严格的测试,达到国家标准才投入生产!
本公司已拥有:楼梯立柱,扶手配件、平开窗系统多点后拉定位窗系统内开上悬窗系统和适用于平开门、推拉门......等等的五金配件。科艺产品出口到中东,东南亚,南美,非洲等地。
科艺本着质量是产品立名之本,信誉是品牌生存之道。顾客满意是企业的出发点和归宿,持续改进是我们的不懈追求!
Keyi Hardware, established in 1997, is a company specializing in designing and manufacturing stairs uprights. To accelerate its development, adapt to the market's demand and promote technological innovation, the Company built a production base covering an area of 15,000 square meters in the Jintao Industrial Park in 2011 and put it into use in the very same year. Apart from advanced production equipment and production lines, the Company aslo estalished its own Research and Development Center, and Testing System, requiring the product must undergo strict performance test and reach national standards before it is put into production.
The Company has the following products: stairs uprights, handrail fittings, side-hung windows, back-pulled multipoint window positioning system, and in-swinging top-hung window system, and other various hardware fittings for sidehung doors and sliding doors, etc. All of them are exported to the Middle East, Southeast Asia, South America, and Africa, etc.
Keyi insists that quality is the foundation for which products are famous and credibility is the point on which the brand survives. The satisfaction of customers is the starting point and destination of the enterprise. The continuous improvement is our unremitting pursuit
科艺产品的设计以人为本,大量采用了新的材料运用在立柱的设计上,更加丰富了立柱的多样性,和满足不同环境的需求不同空间的应用,使您再次插上自由的翅膀走向一个新的品味时空。
Keyi Haredware highlights its product design to be peopleoriented, so lots of new materials have been used in the column design, which not only enriches the variety of the upright and can meet different environments and space application, enabling you to freely enter a new space and time.
科艺强大的产品开发和技术创新能力,积累了丰富的经验和独特的理念,不断为五金行业带来技术性的革命飞跃。
The strong product development and technoiogical innovation power of KEYI ,has accumulated rich experience and unique ideas ,and constartily brought technological revolution leap for the hardware industy.
Technology innovation:
以品质管理为核心的指引下,先后引进国内外先进生产设备、尖端的生产技术,产品品质一直保持领先水平,成为建筑五金配件行业中的佼佼者。
Under the guidance of quality management as the successively introduced domestic and overseas advanced production equipment,top production technology ,the product quality kept the leading level all the time,has become the expert perfomers of construction hardware accessories industry.
STAIRCOLUMN SERIES楼梯立柱系列
平装护栏安装 Installation of Post Railing on Ground
第一步:放线、钻孔
一、膨胀螺栓固定
a. 在完成的装饰面地板上进行安装
b.在结构面上安装,用工具使安装表面平整,用水平尺检查平整度,安装前预先装好预埋件或者按照施工图的图示尺寸放线钻孔,放线,钻孔均在同一直线上,立柱之间的中心距离不大于1200mm;
二、预埋件焊接固定
根据建筑设计图纸,在建筑混凝土结构浇筑时预置埋件,埋件要求平整,保持统一高度,立柱之间的中心距离不大于1200mm。
Step1:Setting-out Route and Driling Hole
1.Fixation of Expansion Bolt
a.Install on the floor
b.Install on the structure panel, flat the installation surface and then inspect the flatness with levelling instrument.Embedded parts should be installed in advance before installation, and then set out route and drill holes according to drawings. Setting out route should be aligned with driling of holes, and the width between tow pillar-center should not exceed 1200 mm
2.Welding of Embedded Parts
According to drawing, the embedded parts should be installed when pouring concrete structure, and the embedded parts should be horizontally installed, besides, the width between two pillar- center should not exceed 1200 mm.
第二步:安装立柱
一、膨胀螺栓固定
Step2:Installation of Pillars
a、要找平安装面
b、钻孔后面要对孔中残渣清理干净
C、将立柱底座的孔对准钻好的孔,插入膨胀螺栓,并敲打进去,使立柱与地面贴紧d、拧紧膨胀螺栓的螺母,既上紧了立柱
二、预埋件焊接固定
a、拉线,定位好立柱的安装位置 a、成,走应灯立任时文表应具
b、找平:预埋件存在不统一水平时,可采用钢片垫平,立柱具有调节功能的无需找平C、焊接固定立柱,立柱为不锈钢的,应采用不锈钢同类的焊条焊接。
1.Fixation of Expansion Bolt
a.Flat the installation surface .
c.Align the hole in the bottom of pillar with the hole predrilled, insert expansion bolt and strike in, so the pillar could be stick to the ground.
d.Screw up the bolt so as to fix the pillar.
b.Cleaning up slag in the holes after drilling.
2.Welding of Embedded Parts
a.otreicn wire straignuy so as to ueterine ue mnstaliauon sies or piliar. a.Stretch wire straightly so as to determine the installation sites of pillar.
b.Add steel discs if the embedded parts are not horizontally installed, but this step is not necessar if the pillar is not adjustable c.The material of electrode should be the same as the one of pillar when welding.
第三步:安装扶手
1、测量护栏所需要扶手的长度,并下料
5、焊缝处理,打磨方式
2、放线扶手固定座位置,在固定位置钻所需要的膨胀螺栓孔,将扶手固定固定在墙上
3、将装饰盖套入扶手管,将扶手管套入固定座并放置立柱的支撑头上,调准立柱并将扶手与立柱、固定座进行焊接或采用螺钉连接
4、在两管交接转弯处用弯头进行焊接连接,两管加长连接采用焊接。
Step 3:Installation of Handrail
1.Measure the needed length of handrail,and determine the fitting needed
2.Drill holes to screw in bolt,and fix handrail on the wall.
3.Sleeve cover plate around the handrail,and sleeve the handrail around the base plate,then place the handrail onto the handrail
supporter,adapt the handrail to supporter,and then connect them through welding or with bolt.
4.Weld handrails with elbow at turning coner,and welding is adopted when connecting two pieces of handrail.
5.Polish welded joints after welding.
第四步:安装玻璃
Step 4:Glass Installation
1、先将立柱上玻璃夹上夹拆开,取出销钉
2、将玻璃靠紧玻璃夹下夹,对正孔后插入销钉
3、装上上夹,上螺钉,调准玻璃再上紧螺钉
1.Dispatch the upper clamp on the pillar and take the dowel out
2.Place glass the into bottom clamp and insert dowel the hole in glass and the hole in clamp coincident.
3.Resume the upper clamp and insert dowel.
第五步:清洁
将护栏清洁后,进行包裹保护,直到整个建筑工程完工,避免在其它施工对护栏造成损坏
Step 5:Cleaning
Wrap the post railing after cleaning until the construction work completes so as to avoid damages when constructing
楼梯护栏安装 Installation of Post Railing on Staircase
第一步:放线、钻孔
1、在同一跑楼梯两端护栏立柱找平安装面
2、钻孔后要对孔中残渣清理干净
3、将立柱底座的孔对准钻好的孔,插入膨胀螺栓,并敲打进去,使立柱与地面贴紧
4、拧紧膨胀螺栓的螺母,既上紧了立柱
Step 1:Setting-out Route and Drilling Hole
a.Flat the installation surface.
b.Cleaning up slag in the holes after drilling.
c.Align the hole in the bottom of pillar with the hole predrilled, insert expansion bolt and strike in, so the pillar could be stick to the ground.
d.Screw up the bolt so as to fix the pillar.
第二步:安装立柱
一、膨胀螺栓固定
1、要找平安装面
2、钻孔后要对孔中残渣清理干净
3、将立柱底座的孔对准钻好的孔,插入膨胀螺栓,并敲打进去,使立柱与地面贴紧
4、拧紧膨胀螺栓的螺母,既上紧了立柱
二、预埋件焊接固定
Step 2: Installation of pillars
1、拉线,定位好立柱的安装位置
2、找平:预埋件存在不统一水平时,可采用钢片垫平,立柱具有调节功能的无需找平
3、焊接固定立柱,立柱为不锈钢的,应采用不锈钢同类的焊条焊接。
1.Fixation of Expansion Bolit
a.Flat the installation surface
b.Cleaning up slag in the holes after drilling
c.Align the hole in the bottom of pillar with the hole predrilled,insert expansion bolt ground.
d.Screw up the bolt so as fix the pillar.
2.Welding of Embedded Parts
a.Stretch wire straightly so as to determine the installation sites of pillar.
b.Add steel discs if the embedded parts are not horizontally installed,but this step is not necessary if the pillar is not adjustable.
c.The material of electrode should be the same as the one of pillar when welding.
第三步:安装扶手
1、测量护栏所需要扶手的长度,并下料.
2、将扶手采用焊接或螺钉固定扶手与立柱上,将扶手与两端的立柱固定起来
3、连接各跑楼梯的扶手.
Step 3: Installation of Handrail
1.Measure the needed length of handrail,and determinethe fitting needed.
2.Fix handrail onto pillar through welding or with screws ,and then fix handrail and pillars on both sides.
3.Connect handrails of each stair.
第四步:安装中间立柱
Step 4:Middle Pillars Installation
1、采用立柱靠扶手的方法找楼梯中间的立柱安装位置,并划线
1.Determine the installation sites of middle pillars by closing the phandrails,and mark on the determined sites.
2.Drill holes and fix pillars,then connect handrails.
第五步:安装栏板
1、测量玻璃栏板尺寸,并购置玻璃
2、安装玻璃栏板,或其他栏板
Step 5: Glass Installation
1.Determine the dimension of glass.
2.Glass installation.
第六步:清洁
将护栏清洁后,进行包裹保护,直到整个建筑工程完工,避免在其它施工对护栏造成损坏
Step 6: Cleaning Wrap the post railing after cleaning until the construction work completes so as to avoid damages when constructing.
STAIRCOLUMN SERIES楼梯立柱系列
玻璃护栏立柱 Glass Staircase Pillar
一、分类Classification
1、按立柱柱体体形状分类:Classiffied by the shape of pillar' boby
圆管立柱,Circular Tube Pillar
方管立柱,Square Tube Pillar
矩形管立柱,Rectangular Tube Pillar
平椭圆管立柱,Flat Elliptic Tube Pillar
单板立柱,Single-plate Pillar
双板立柱,Double-plate Pillar
2、按立柱高度分类:Classifed by the height of prillar
H=1050mm, L stands for 1050mm high pillar
H=850mm,Sstands for 850mm high pillar
其他高度,按实际高度数字为代号。Others marked with actual height
二、基本参数Basic Paremeter
| 栏板固定型方式Fixed ways | 立柱高度 H mmThe height of the pillar | L1 | L2 | 图形 Figure![]() ![]() |
| L(1050) | ||||
| M (930) | ||||
| S (850) | ||||
| 夹持型 其他高度Glass Clamping 230 220Other height | ||||
| L(1050) | ||||
| M (930) | ||||
| S (850) | ||||
| 承托型 其他高度110 120Glass HoldingOther height | ||||
Note : Glass Clamping style can be used directly on stairs or slope while holding style can not.
三、玻璃护栏立柱结构Pillar with Glass GuardrailStructure
| 立柱形状Shape | 规格 mmType mm | 公称壁厚或公称板厚mm |
| 圆管立柱Circular Pillar | Φ50 | 1.5、2.0、2.5 |
| 方管立柱Shape Pillar | 40×40 | 1.5、2.0、2.5 |
| 矩形管立柱Rectangular Pillar | $5 0 \times 1 0 , ~ 5 0 \times 3 0$ | 1.0、1.2、1.5、2.0、2.5 |
| 平椭圆管Flat Elliptic Pillar | 60×30 | 1.5、2.0、2.5 |
| 单板立柱Single -plate Pillar | -- | 8、10、12 |
| 双板立柱Double -plate Pillar | -- | 8、6、8、10 |
Note: 1. we mainly nly supply single-plate with pillar with 10mm, double-with 6mm, and circular pillar with 2mm,please mark out if other plate thickness is requird
2. if the galvanized Q235 bottom plate is required ,please mark out before is placed
STAIR COLUMN SERIES
楼梯立柱系列
STAIRCOLUMN SERIES楼梯立柱系列
STAIRCOLUMN SERIES楼梯立柱系列
STAIR COLUMN SERIES
楼梯立柱系列
STAIRCOLUMN SERIES楼梯立柱系列
850mm KY-256 表面处理:镜光+哑光 Finish: PSS+Satin 高度:850mm Helght: 850mm
STAIRCOLUMN SERIES楼梯立柱系列
STAIRCOLUMN SERIES楼梯立柱系列
楼梯立柱系列
STAIRCOLUMN SERIES楼梯立柱系列
STAIRCOLUMN SERIES楼梯立柱系列
STAIRCOLUMN SERIES楼梯立柱系列
KY-A03 表面处理:拉丝、 镜光、PVD Finish: SSS/PSS/PVD
KY-A04 表面处理:拉丝、 镜光、PVD Finish: SSS/PSS/PVD
KY-A07
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-A09
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-A10
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-A06 表面处理:拉丝、 镜光、PVD Finish: SSS/PSS/PVD
STAIR COLUMN SERIES
楼梯立柱系列
可选安装方式Option Installation Methods
Underground installation 预埋式
可选安装方式Option Installation Methods
Underground installation 预埋式
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-611
STAIR
COLUMN SERIES
楼梯立柱系列
KY-613B
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-624
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-628
表面处理:拉丝、镜光、PVDFinlsh: SSS/PSS/PVD
KY-630C
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-629
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-630D
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-626
KY-629B
KY-627
KY-631
KY-629C
KY-632
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
STAIR
COLUMN SERIES
楼梯立柱系列
KY-633
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-636
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-637
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
表面处理:拉丝、镜光、PVDFinish:SSS/PSS/PVD
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-640
KY-634
KY-636A
KY-637B
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-641
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-635
KY-636B
KY-638
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
表面处理:拉丝、镜光、PVDFinish:SSS/PSS/PVD
KY-642
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-635B
KY-636C
KY-639
KY-643
表面处理:拉丝、镜光、PVDFinish:SSS/PSS/PVD
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-645
表面处理:拉丝、镜光、PVDFinish:SSS/PSS/PVD
KY-646
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-650
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-652
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-653
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
KY-647
KY-654
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
表面处理:拉丝、镜光、PVDFinish: SSS/PSS/PVD
STAIR
COLUMN SERIES
楼梯立柱系列
STAIR
COLUMN SERIES
楼梯立柱系列






