Document Ver. 1.0
Quick Installation Guide
Hybrid Inverter
CGH S3.6L CGH S4.6L CGH S5.0L CGH S6.0L
Before installing the equipment,read the user manual carefullyto get familiar with
product information and safety precautions.The product warranty does not cover
equipment damage caused byfailure to follow the storage, transportation, installation.
and usage guidelines specified in this document and the user manual. Scan the QR code
on the equipment to view the user manual and safety precautions.Theinformation in
this document is subject to change without notice. Every effort has been made in the
preparation ofthis document to ensure accuracyofthe contents, but all statements.
information, and recommendations in this document do not constitute a warranty of any
kind,express orimplied.
2
1 Product Introduction
1.1 Product Composition
420mm
520mm
224mm
1.2 Overall Dimensions
1
2
3
4
5
6
7
8
9
10
11
12
Front Panel
Battery DC Input Port (BAT+/BAT-)
Ground Point
Inductance Module
Heat Sink
Led Indicator
PV DC Input Port (PV1/PV2)
Interface of the Dongle(COM)
ON-GRID AC Output Port (ON GRID)
BACK-UP AC Output Port (BACK UP)
Communication Interface
PV Switch (PV SWITCH)
3
2 Installation Procedure
2.1 Check the Packing List of Hybrid Inverter
2.2 Installation Environment Requirements
Inverter x 1 Wall Mounted
Shelf x 1 PV Connectors x 2 BACK-UP
Connector x 1
ON-GRID
Connector x 1
BAT Connectors x 2 Dongle x 1 Product
Documentation x 1 Expansion Screw x 4
OT Terminal x 1 M5*12 Screw x 2 AC Disassembling
tool x 1
PV Disassembling
tool x 1
IP66
Smart Meterx 1
Meter Cable x 1
4
2.3 Installation Angle Requirements
2.4 Installation Procedure
330mm
80mm
φ10mm
60-65mm
5
3 Electrical Connection
L = L1 + (1~2)mm
Copper Wire
8mm2 ≤ S ≤ 10mm2
L1
Ground Connection
L = L1 + (1~2)mm
Copper Wire
8mm2 ≤ S ≤ 10mm2
L1
3.2 AC Connection
9mm
Φ 10-12mm 22mm
BACK-UP 2.5mm2≤S≤6mm2
ON-GRID 6mm2≤S≤10mm2
M3
Click
6
3.3 PV Connection (PV)
7-8mm
7-8mm
Φ 5.5-8mm
4mm2 ≤ S ≤ 6mm2
0< V ≤ 600V
Click
Click
7
3.4 Battery Connection
14mm
9.5-12.5mm
14mm
9.5-12.5mm
25mm2 ≤ S ≤ 35mm2
Click
8
Port
DRM
DO / DI
Meter
EMS
PAR
BMS
Funtion
To realize Demand Responseor Logic interface function,
this function maybe required in UK and Australia.
Dry contact port.
Used for RS485 communication between inverter and the smartmeter,
lt is necessary to realize the normal hybrid control logics.
EMS COM port: used to connect with the third party device.
PAR COM port: serve as the COM port for the inverter parallelizing
Used for communication between inverter and Lithium battery BMS.
4 Communication Connection
Please make sure that the CT is installed
at the point of common coupling and
the direction is right, otherwise the
system will not operation normally!
NOTE:
Single-phase Meter Installation
Grid side House side
SDM120CT
PE
L
RS485 B
RS485 A Hybri
d Inverter
White Black
GRID N
9
APP Download
Install the Communication 5 Module-Dongle
To commission the inverter, download the Clenergise app from the iOS App Store or Google
Play Store.
Connect one end to the battery COM1 port,Connect the other end to the inverter BMS port
BMS-CAN
Inverter Side
CAN-L
CAN-H
BMS Port Connection
IOS Android
A Clenergy Technologies Company
No. 1001, 1003, 1005, 1007, 1009, Min'an Rd., Torch Hi-Tech Ind. Development
Zone, Xiang'An District, Xiamen Fujian, China
Global Contact Numbers
CN: +86 592 311 0088
DE: +49 (0) 40 3562 389 00
AU: +61 3 9239 8088
TH: +66 (0) 2 277 5201
JP: +81 45 228 8226
TH: +63 977 840 7240
Global Partners
UK: +44 (0) 1604 877573




