Starting box/plug-in box production
51
YOUR CONPANY NAME
On-site construction scene A
52
YOUR CONPANY NAME
Scenario A: on-site plug-in box is installed in order from small to large address, so touchscreen debugging is the easiest
RS485 add vary
from small to large
RS485 add vary
from small to large
Start box address factory default range:201-
204
Plug-in box address factory default range:
001-200
On-site construction scene A
53
YOUR CONPANY NAME
Scene A:Scanning device & device matching
On-site construction scene B
54
YOUR CONPANY NAME
Scene B:The on-site plug-in box be installed randomly, and one line address shall not be repeated (the
plug-in box address shall not be modified).
RS485 address order
is irregular
RS485 address order is
irregular
!!!
Record the actual installation address
according to the installation location
!!!
Start box address factory default range:
201-204
Plug-in box address factory default range
:001-200
On-site construction scene B
55
YOUR CONPANY NAME
Scene B:modify touch screen address Make it consistent with
the address and location of the record
On-site construction scene C(Don’t recommend
56
YOUR CONPANY NAME
Scene C:On-site plug-in box is installed randomly, and a line address is not repeated(Modify the plug-in box address)
RS485 address order
is irregular
RS485 address order
is irregular
!!!
Modify the mailing address of the
plug-in box in order starting from
1!!!
Start box address factory default
range:201-204
Plug-in box address factory
default range:001-200
On-site construction scene C:Solution 1
57
YOUR CONPANY NAME
Scene C:Modify the address of the plug-in box through the touch screen to make it consistent
with the preset address and position of the touch screen
Steps to modify the address of the plug-in box:
1. Connect the plug-in box to be set with the touch screen
via rs485 port 1.Communication lines of other equipment
disconnect or meter power off;
2. Press the "Read" button to check whether the line
connection to the plu-in box is normal and the current
address;
3. Press the imeter communication address "1" in the lower
left picture, and enter the corresponding address according
to the preset address list;
4. Press the "Settings" button to confirm the setting box.
Press the "Settings" button to confirm the setting box.
5. Press the "Read" button to ensure that the mailing
address is set successfully.
On-site construction scene C:Solution 2
58
YOUR CONPANY NAME
Scene C:Modify the address of the plug-in box through the displayer so that it matches the preset address and
location of the touch screen
Modify the address of the plu-in box:
1. Connect the plug-in box to be set and the
displayer with a separate network
cable.
2. Modify the address of the plug-in box
according to the setting process in the left
On-site construction scene C:Solution 3
59
YOUR CONPANY NAME
Scene C: through debugging software to make it consistent
with the preset address and position of the touch screen
Modify the address of the plug-in box:
1.Connect the plug-in box to set the address with the computer separately by USB to RS485 communication
tool.Communication lines of other equipment disconnect or meter power off;
2.Modify the address of the plug-in box according to the setting process in the left figure to make it consistent with the
Touch screen monitoring system
60
YOUR CONPANY NAME
Data transfer power and environment monitoring system: IP address
Touch screen monitoring system
61
YOUR CONPANY NAME
Data transfer power and environment monitoring system: IP address, gateway, subnet
mask
Press and hold the screen to enter
the system setting interface
Wired networking scheme
62
YOUR CONPANY NAME
Wired networking scheme
63
YOUR CONPANY NAME
Wireless networking solution
64
YOUR CONPANY NAME
Wireless networking solution
65
YOUR CONPANY NAME
Relevant qualifications
66
YOUR CONPANY NAME
Examples of type selection configuration
67
YOUR CONPANY NAME
Examples of type selection configuration
68
YOUR CONPANY NAME
山西电信小母线
招标文件
山西电信小母线
配置表
Relevant materials
69
YOUR CONPANY NAME
AMB母线监控组
网示意图
AMB交流监控产
品说明书
AMB直流监控产
品说明书
!!!Double-click on the icon to open the following related
documents !!!
No power cuts, no line stock renovation projects
70
YOUR CONPANY NAME
Recommended accessories: magnetic steel & iron temperature probe & split CT
71
THANKS




