电机型号Motormodel
RGW110-A3-40
| 动子Forcer | RGWA3-40 |
| 电机推力Force | 持续推力200N,峰值推力600.1NThesustainedthrustis200N,thepeakthrustis600.1N |
| 电流Current | 持续电流6A,峰值电流18AContinuouscurrent6A,peakcurrent18A |
| 导轨Guiderail | 15(双导轨)15(doublerail) |
| 电机最大速度 Maximumspeed | 5m/s |
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)±6um/500mm |
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetition accuracy±1umPositioning accuracy (aftercompensation)±2um/5o0mm | |
| 反馈Feedback | 0.5um,1um可选0.5um,1umoptional |
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 0.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1,in the standard linear motormodule operation process,the platform willbe subjected togreaterimpact,so the installation platform needstohave sufficient stiffness and stability If the instllation platform stiffnessf it is insufficient, the standardmodule ill appear jiter and resonance during operation,which will affect thepositioning accuracy,repetition accuracyand equipment.
2.If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the numberof lockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm and the occasion with high accuracy requirements needs to be not less than0.02mm/500mm.
4, clean the table to ensure that the installation table is free of foreign bodies, burrs and other items that may hinder the installation.
尺寸示意图
电机型号Motormodel
RGW110-A1-50
| 动子Forcer | RGWA1-50 |
| 电机推力Force | 持续推力73.5N,峰值推力220.5NThesustainedthrustis73.5N,thepeakthrustis220.5N |
| 电流Current | 持续电流3A,峰值电流9AContinuouscurrent3A,peakcurrent9A |
| 导轨Guiderail | 15(双导轨)15(doublerail) |
| 电机最大速度 Maximumspeed | 5m/s |
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)±6um/500mm |
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetitionaccuracy±1umPositioning accuracy(aftercompensation)±2um/5o0mm | |
| 反馈Feedback | 0.5um,1um可选0.5um,1umoptional |
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 \dot{^{.}}0.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1. in the standard linearmotormodule operation process,the platform will be subjected to greaterimpact, so the installation platformneedstohave sufficientstiffnessandstability.f theinstallationplatformstiffnesslf it isinsufficient,thestandardmodulewillappearjiterandresonance during operation,which will affect thepositioning accuracy,repetition accuracyandequipment.
2.If conditions permit,the contact area between the module base and the installation table should be increased as much as possible, as well as the numberof lockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan 0.02mm/500mm
4, clean the table to ensure that the installation table is free of foreign bodies, burrs and other items that may hinder the installation.
尺寸示意图
电机型号Motormodel
RGW110-A2-50
| 动子Forcer | RGWA2-50 |
| 电机推力Force | 持续推力188.2N,峰值推力564.5NThesustained thrustis188.2N,thepeakthrustis564.5N |
| 电流Current | 持续电流6A,峰值电流18AContinuouscurrent6A,peakcurrent18A |
| 导轨Guiderail | 15(双导轨)15(doublerail) |
| 电机最大速度 Maximumspeed | 5m/s |
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)±6um/500mm |
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm m | |
| 反馈Feedback | 0.5um,1um可选0.5um,1umoptional |
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 *0.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1. in the standard linearmotormodule operationprocess,the platform will be subjected to greaterimpact, so theinstallation plaformneedstohave sufficient stiffnessandstability.f theinstallationplatformstiffnesslf it isinsufficientthestandardmodulewillappearjiterandresonance during operation,which will affect thepositioning accuracy,repetitionaccuracy and equipment.
2. If condlitions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the number of lock screws.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan 0.02\mathsf{mm}/500\mathsf{mm}
4, clean the table to ensure that the installation table is free of foreign bodies,burrs and otheritems that mayhinderthe installation.
尺寸示意图
电机型号Motormodel
RGW110-A3-50
| 动子Forcer | RGWA3-50 |
| 电机推力Force | 持续推力295.8N,峰值推力887.4NThesustainedthrust is295.8N,thepeakthrustis887.4N |
| 电流Current | 持续电流6A,峰值电流18AContinuouscurrent6A,peakcurrent18A |
| 导轨Guiderail | 15(双导轨)15(doublerail) |
| 电机最大速度 Maximumspeed | 5m/s |
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)±6um/500mm |
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetitionaccuracy±1umPositioning accuracy(aftercompensation)±2um/5o0mm | |
| 反馈Feedback | 0.5um,1um可选0.5um,1umoptional |
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 0.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1, in the standard linear motor module operation process,the platform willbe subjected to greater impact, so the installation platform needs to have sufficient stiffness and stability If the installtion platform stiffnessf it is insufficient, the standardmodule willappear jiter and resonance during operation,which will affect thepositioning accuracy,repetition accuracyand equipment.
2. If condlitions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the numberof lock screws.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan0.02mm/500mm.
Ire that theinstallation tableisfree of foreignbodies,burrs andotheritems thatmayhinde
尺寸示意图
电机型号Motormodel
RGW140-A1-50
| 动子Forcer | RGWA1-50 |
| 电机推力Force | 持续推力73.5N,峰值推力220.5NThesustainedthrustis73.5N,thepeakthrustis220.5N |
| 电流Current | 持续电流3A,峰值电流9AContinuouscurrent3A,peakcurrent9A |
| 导轨Guiderail | 15(双导轨)15(doublerail) |
| 电机最大速度 Maximumspeed | 5m/s |
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)+6um/500mm Magneticgate:repetitionaccuracy±3umPositioningaccuracy(aftercompensation)±6um/5o0mm |
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetitionaccuracy±1umPositioning accuracy(aftercompensation)±2um/5o0mm | |
| 反馈Feedback | 0.5um,1um可选0.5um,1umoptional |
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 \dot{0}.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1, in the standard linear motormodule operation process,the platform willbe subjected to greaterimpact,so theinstallation platform needsto have sufficient stiffness and stability. f the installation platform stiffnesf it is insufficient,the standard module willappear jitter and resonance during operation,which will affect thepositioning accuracy,repetition accuracyand equipment.
2.If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as wellas the numberoflockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm and the occasion with high accuracy requirements needs to be not less than 0.02mm/500mm.
4, cleanthe table to ensure that the installation table is free of foreign bodies,burrs and otheritems that mayhinderthe installation.
尺寸示意图
电机型号Motormodel
RGW140-A2-50
| 动子Forcer | RGWA2-50 |
| 电机推力Force | 持续推力188.2N,峰值推力564.5NThesustainedthrustis188.2N,thepeakthrustis564.5N |
| 电流Current | 持续电流6A,峰值电流18AContinuouscurrent6A,peakcurrent18A |
| 导轨Guiderail | 15(双导轨)15(doublerail) |
| 电机最大速度 Maximumspeed | 5m/s |
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)±6um/500mm |
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetitionaccuracy±1μmPositioning accuracy(aftercompensation)±2um/5o0mm | |
| 反馈Feedback | 0.5um,1um可选0.5um,1umoptional |
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 ^{-0.02\mathsf{mm}/500\mathsf{mm}}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1. in the standard linearmotormodule operationprocess,the platform will be subjected to greaterimpact so the installation platformneedstohave sufficientstiffnessandstabilityf theinstallationplatformstiffnesslf it isinsufficient,thestandardmodulewillappearjitterandresonance during operation,which will affecthepositioning accuracy,repetitionaccuracyandequipment.
2.If conditions permit, the contact area between the module base and the installation table should be increased as much as possible,as wellas the numberof lockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan0.02mm/500mm.
4,cleanthe tableto ensure that theinstallation table is free offoreignbodies,burrs andotheritems thatmayhindertheinstallation.
尺寸示意图
电机型号Motormodel
RGW140-A3-50
| 动子Forcer | RGWA3-50 |
| 电机推力Force | 持续推力295.8N,峰值推力887.4NThesustained thrustis295.8N,thepeakthrustis887.4N |
| 电流Current | 持续电流6A,峰值电流18AContinuouscurrent6A,peakcurrent18A |
| 导轨Guiderail | 15(双导轨)15(doublerail) |
| 电机最大速度 Maximumspeed | 5m/s |
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)±6um/500mm |
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetition accuracy±1umPositioning accuracy (aftercompensation)±2um/5o0mm | |
| 反馈Feedback | 0.5um,1um可选0.5um,1umoptional |
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 0.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1,in the standard linear motormodule operation process,the platform willbe subjected togreaterimpact,so the installation platform needstohave sufficient stiffness and stability If the instllation platform stiffnessf it is insufficient, the standardmodule ill appear jiter and resonance during operation,which will affect thepositioning accuracy,repetition accuracyand equipment.
2.If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the numberof lockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm and the occasion with high accuracy requirements needs to be not less than0.02mm/500mm.
4, clean the table to ensure that the installation table is free of foreign bodies, burrs and other items that may hinder the installation.
尺寸示意图
电机型号Motormodel
RGW140-A1-75
| 动子Forcer | RGWA1-75 |
| 电机推力Force | 持续推力138.2N,峰值推力414.5NThesustainedthrustis138.2N.thepeakthrustis414.5N |
| 电流Current | 持续电流3A,峰值电流9AContinuouscurrent3A,peakcurrent9A |
| 导轨Guiderail | 15(双导轨)15(doublerail) |
| 电机最大速度 Maximumspeed | 5m/s |
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)+6um/500mm |
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetition accuracy±1umPositioning accuracy(aftercompensation)±2um/5o0mm | |
| 反馈Feedback | 0.5um,1um可选0.5um.1umoptional |
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 0.02\mathsf{mm}/500\mathsf{mm} ®
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1.inthe standard linearmotormodule operationprocess,theplatform willbe subjectedtogreaterimpact,so theinstallationplatformneedstohave sufficient stiffness and stability.f the installtionplatform stiffnessf it is insufficient, thestandard module will appear jitter and resonance during operation,which will affect thepositioning accuracy,repetition accuracyand equipment.
2.If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the numberof lockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan0.02mm/500mm.
4, clean the table to ensure that the installation table is free of foreign bodies, burrs and other items that may hinder the installation.
尺寸示意图
电机型号Motor model
RGW140-A2-75
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 0.02mm/500mm
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1.in the standard linear motormodule operation process,the platform willbe subjectedto greaterimpact,so the installation platform needsto have sufficient stiffness and stability.If the installation platform stiffnesslfit is insufficient,the standard module illappear jiter and resonance during operation,whichwill affect thepositioning accuracy,repetition accuracy and equipment.
2. If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the numberof lock screws.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan0.02mm/500mm.
re that theinstallation tableisfreeofforeignbodies,burrsand otheritemsthatmayhinde
尺寸示意图
Dimensional diagram
电机型号Motormodel
RGW140-A3-75
| 动子Forcer | RGWA3-75 |
| 电机推力Force | 持续推力506.4N,峰值推力1519.2NThesustained thrustis506.4N,thepeakthrustis1519.2N |
| 电流Current | 持续电流6A,峰值电流18AContinuouscurrent6A,peakcurrent18A |
| 导轨Guiderail | 15(双导轨)15(doublerail) |
| 电机最大速度 Maximumspeed | 5m/s |
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)±6um/500mm |
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetition accuracy±1umPositioning accuracy(after compensation)±2um/5o0mm | |
| 反馈Feedback | 0.5um,1um可选0.5um.1umoptional |
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 0.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1.inthe standard linearmotormodule operationprocess,theplatform willbe subjectedtogreaterimpact,so theinstallationplatformneedstohave sufficient stiffness and stability.f the installtionplatform stiffnessf it is insufficient, thestandard module will appear jitter and resonance during operation,which will affect thepositioning accuracy,repetition accuracyand equipment.
2.If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the numberof lockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan0.02mm/500mm.
4, clean the table to ensure that the installation table is free of foreign bodies, burrs and other items that may hinder the installation.
尺寸示意图
电机型号Motormodel
RGW170-A1-75
| 参数指标 Parameterindicators | |||||||||||||||||
| RGWA1-75 | |||||||||||||||||
| 动子Forcer | |||||||||||||||||
| 电机推力Force | 持续推力138.2N,峰值推力414.5NThesustained thrustis138.2N,thepeakthrust is414.5N | ||||||||||||||||
| 电流Current 导轨Guiderail | 持续电流3A,峰值电流9AContinuouscurrent3A,peakcurrent9A 15(双导轨)15(doublerail) | ||||||||||||||||
| 电机最大速度 | 5m/s | ||||||||||||||||
| Maximum speed 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)+6um/500mm | ||||||||||||||||
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetition accuracy±1umPositioning accuracy (aftercompensation)±2um/5o0mm | |||||||||||||||||
| 反馈Feedback | 0.5um,1um可选0.5um.1umoptional | ||||||||||||||||
| 有效行程 Effective travel | 80+N*40 | 1000 | |||||||||||||||
| 底座长度 Base length | L+ 130 | 250290330370 410450490530570 610650690730 7708108508909309701010105010901130 | |||||||||||||||
| 总长Total length | D+0 | 290330370 410 450490530570610650690730 77081085089093097010101050109011301170 | |||||||||||||||
| nd 80 is the basis. For example, module L120 N= (120-80) /40=1 | |||||||||||||||||
| 重量Weight 最大总长 Maximumtotal length Note: The formula for calculating the tota | 5000 注明:钢带模组总长计算公式为D+30,行程进制为40,N表示增加的行程段数,80为基准。如:L120模组N=(120-80)/40=1 | ||||||||||||||||
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 0.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1,in the standard linearmotormoduleoperation process,the platform willbe subjectedto greaterimpactso theinstallation platformneedstohave sufficient stiffnessandstability.f theinstallation platform stiffnesslf it isinsufficient,thestandard module willappear jitterandresonance during operation, which willaffect the positioning accuracy,repetition accuracy and equipment.
2.If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the number of lock screws.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan0.02mm/500mm.
尺寸示意图
Dimensional diagram
电机型号Motor model
RGW170-A2-75
| 动子Forcer | RGWA2-75 |
| 电机推力Force | 持续推力294N,峰值推力882NThesustainedthrustis294N,thepeakthrustis882N |
| 电流Current | 持续电流6A,峰值电流18AContinuouscurrent6A,peakcurrent18A |
| 导轨Guiderail | 15(双导轨)15(doublerail) |
| 电机最大速度 Maximumspeed | 5m/s |
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)+6um/500mm |
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetitionaccuracy±1umPositioningaccuracy(aftercompensation)±2um/5oomm | |
| 反馈Feedback | 0.5um,1um可选0.5um,1umoptional |
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 *0.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1.in the standard linearmotormodule operation proces,the platformwill be subjected togreaterimpact so the installation platformneedstohave sufficient stiffnessandstability.lf the installationplatformstiffnesslf it isinsufficient,the standardmodule willappearjitterandresonance during operation,which willaffecthe positioning accuracy,repetition accuracyand equipment.
2.If conditions permit,the contact area between the module base and the installation table should be increased as much as possible, as well as the numberof lock screws.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm and the occasion with high accuracy requirements needs to be not lessthan0.02mm/500mm.
4, clean the table to ensure that the installation table is free of foreign bodies, burrs and other items that may hinder the installation.
尺寸示意图
电机型号Motormodel
RGW170-A3-75
| 动子Forcer | RGWA3-75 |
| 电机推力Force | 持续推力506.4N,峰值推力1519.2NThesustainedthrustis506.4N,thepeakthrustis1519.2N |
| 电流Current | 持续电流6A,峰值电流18AContinuouscurrent6A,peakcurrent18A |
| 导轨Guiderail | 15(双导轨)15(doublerail) |
| 电机最大速度 Maximumspeed | 5m/s |
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)+6um/500mm |
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetition accuracy±1umPositioning accuracy(aftercompensation)±2um/5o0mm | |
| 反馈Feedback | 0.5um,1um可选0.5um.1umoptional |
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 0.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1.inthe standard linearmotormodule operationprocess,theplatform willbe subjectedtogreaterimpact,so theinstallationplatformneedstohave sufficient stiffness and stability.f the installtionplatform stiffnessf it is insufficient, thestandard module will appear jitter and resonance during operation,which will affect thepositioning accuracy,repetition accuracyand equipment.
2.If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the numberof lockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan0.02mm/500mm.
4, clean the table to ensure that the installation table is free of foreign bodies, burrs and other items that may hinder the installation.
尺寸示意图
电机型号 MotormodelRGW170-A1-100
| 动子Forcer | RGWA1-100 | |||||||||||||||||||||
| 电机推力Force | 持续推力208.7N,峰值推力626.2NThesustained thrustis208.7N,thepeakthrustis626.2N | |||||||||||||||||||||
| 电流Current | 持续电流3A,峰值电流9AContinuouscurrent3A,peakcurrent9A | |||||||||||||||||||||
| 导轨Guiderail 电机最大速度 | 15(双导轨)15(doublerail) | |||||||||||||||||||||
| Maximumspeed | 5m/s 磁栅:重复精度±3um定位精度(补偿后)+6um/500mm | |||||||||||||||||||||
| 精度Precision 反馈Feedback | Magneticgate:repetitionaccuracy±3umPositioningaccuracy(aftercompensation)±6um/50omm 光栅:重复精度±1um定位精度(补偿后)±2um/500mm | |||||||||||||||||||||
| Grating:Repetitionaccuracy±1umPositioningaccuracy(aftercompensation)±2um/500mm 0.5um,1um可选0.5um,1umoptional | ||||||||||||||||||||||
| 有效行程 Effective travel | 80+N*40 | 920 | 960 | 1000 | ||||||||||||||||||
| 底座长度 Base length | L+130 | 250290330 370 410450490530570610650690 730770810850 890930970 1010 10501090 1130 | ||||||||||||||||||||
| 总长Total length | D+40 | |||||||||||||||||||||
| 重量Weight Note:The | 290330370 410 450490530 570610 650690 730 770810850890 930970 10101050 10901130 1170 | |||||||||||||||||||||
| 8.5 + N*0.93 9.43 10.3611.2912.2213.1514.0815.0115.9416.87 17.8 18.7319.6620.5921.5222.4523.3824.3125.2426.1727.128.03 28.96 29.89 | (120-80)/40=1 | |||||||||||||||||||||
| 最大总长 5000 Maximumtotal length 注明:钢带模组总长计算公式为D+30,行程进制为40,N表示增加的行程段数,80为基准。如:L120模组N=(120-80)/40=1 | ||||||||||||||||||||||
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 *0.02\mathsf{mm}/500\mathsf{mm},
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1, in the standard linear motor module operation process,theplatform will be subjected to greaterimpact,so the installation platform needsto have sufficient stiffnessandstability.f theinstallationplatform stiffnesslf it isinsufficient,the standardmodulewillappearjitterandresonance during operation, which willaffect the positioning accuracy,.repetition accuracy and equipment.
2. If condlitions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the number of lock screws.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not less than 0.02mm/500mm
lat the installation table is free of foreign bodies, burrs and other items that may hinder the
尺寸示意图
电机型号Motormodel
RGW170-A2-100
| 动子Forcer | RGWA2-100 |
| 电机推力Force | 持续推力429.2N,峰值推力1287.7NThesustained thrust is429.2N,thepeakthrust is1287.7N |
| 电流Current | 持续电流6A,峰值电流18AContinuouscurrent6A,peakcurrent18A |
| 导轨Guiderail | 15(双导轨)15(doublerail) |
| 电机最大速度 Maximumspeed | 5m/s |
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)+6um/500mm m |
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetition accuracy±1umPositioning accuracy (aftercompensation)±2um/5o0mm | |
| 反馈Feedback | 0.5um,1um可选0.5um,1umoptional |
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 \dot{0}.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1.in the standard linearmotormodule operation process,the platform will be subjected to greaterimpact,so the installation platform needs tohave sufficient stiffness and stability. f the installation platform stiffnessif it is insufficient,the standard module will appear jiter and resonance during operation,which willaffecthepositioning accuracy,repetition accuracyand equipment.
2.If conditions permit,the contact area between the module base and the installation table should be increased as much as possible, as well as the numberof lockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan0.02mm/500mm.
4, clean the table to ensure that the installation table is free of foreign bodies, burrs and other items that may hinder the installation.
尺寸示意图
电机型号
| 参数指标 Parameterindicators | ||||||||||||||||||
| RGWA3-100 | ||||||||||||||||||
| 动子Forcer | ||||||||||||||||||
| 电机推力Force | 持续推力733.2N,峰值推力2199.6NThe sustained thrust is733.2N,thepeak thrust is2199.6N | |||||||||||||||||
| 电流Current 导轨Guiderail | 持续电流6A,峰值电流18AContinuouscurrent6A,peakcurrent18A | |||||||||||||||||
| 电机最大速度 | 15(双导轨)15(doublerail) 5m/s | |||||||||||||||||
| Maximumspeed 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)±6um/500mm Magneticgate:repetitionaccuracy±3umPositioningaccuracy(aftercompensation)±6um/500mm | |||||||||||||||||
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetition accuracy±1μmPositioning accuracy(aftercompensation)±2um/5oomm | ||||||||||||||||||
| 反馈Feedback | 0.5um,1um可选0.5um,1umoptional | |||||||||||||||||
| 有效行程 Effective travel | 80+N*40 | 1000 | ||||||||||||||||
| 底座长度 Base length | L+290 | 410450490530 570 6106506907307708108508909309701010 105010901130 11701210 12501290 | ||||||||||||||||
| 总长Total length | D+40 | |||||||||||||||||
| nodule L120 N= (120-80) /40=1 | ||||||||||||||||||
| 重量weight 最大总长 Note: The formula for calculating the t | 13.6+ N*0.9314.5315.4616.3917.3218.2519.18 20.1121.0421.97 22.9 23.8324.7625.6926.6227.5528.48 29.4130.3431.27 32.2 33.13 34.06 34.99 5000 Maximum total length 注明:钢带模组总长计算公式为D+30,行程进制为40,N表示增加的行程段数,80为基准。如:L120模组N=(120-80)/40=1 | |||||||||||||||||
安装要求
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 \dot{0}.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1,in the standard linear motormodule operation process,the platform willbe subjected to greaterimpact,so theinstallation platform needstohave sufficient stiffness and stability. If the installtion platform stiffnessf it is insufficient, the standardmodule willappear jiter and resonance during operation, which willaffecthe positioning acuracy,repetition accuracy and equipment.
2. If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the number of lock screws.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be no1 lesthan0.02mm/500mm.
at the installation table is free of foreign bodies,burrs and other items that may hinder thei
尺寸示意图
电机型号Motormodel
RGW210-A1-100
| 动子Forcer | RGWA1-100 | ||||||||||||||||||||||
| 电机推力Force | 持续推力208.7N,峰值推力626.2NThe sustained thrust is208.7N,thepeakthrust is626.2N | ||||||||||||||||||||||
| 电流Current | 持续电流3A,峰值电流9AContinuouscurrent3A,peakcurrent9A | ||||||||||||||||||||||
| 导轨Guiderail | 15/20(双导轨)15/20(doublerail) | ||||||||||||||||||||||
| 电机最大速度 Maximumspeed | 5m/s | ||||||||||||||||||||||
| 精度Precision 反馈Feedback | 磁栅:重复精度±3um定位精度(补偿后)±6um/500mm Magneticgate:repetitionaccuracy±3umPositioningaccuracy(aftercompensation)±6um/5o0mm 光栅:重复精度±1um定位精度(补偿后)±2um/500mm | ||||||||||||||||||||||
| Grating:Repetitionaccuracy±1umPositioning accuracy(aftercompensation)±2um/5oomm 0.5um,1um可选0.5um,1umoptional | |||||||||||||||||||||||
| 有效行程 | 900 | 09409801020 | |||||||||||||||||||||
| Effective travel 底座长度 | 100+N*40 | ||||||||||||||||||||||
| Base length | L+150 | ||||||||||||||||||||||
| 总长Totallength | D+40 | 330370410450 490530570610650 690730770810850890930 970101010501090 1130 11701210 | |||||||||||||||||||||
| 重量weight 最大总长 | 11.25+N*1.16|12.4113.5714.7315.8917.0518.2119.3720.53 21.6922.85 24.0125.1726.3327.4928.65 29.8130.9732.1333.29 34.45 35.61 36.77 37.93 | 20-8040= | |||||||||||||||||||||
| 5000 Maximum total length 注明:钢带模组总长计算公式为D+30,行程进制为40,N表示增加的行程段数,80为基准。如:L120模组N=(120-80)/40=1 | |||||||||||||||||||||||
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 *0.02\mathsf{mm}/500\mathsf{mm} ®
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1.in thestandard linearmotormodule operationprocess,the platformwill be subjected to greaterimpact,so theinstallation plaformneedstohave sufficient stiffnessandstability.If theinstallationplatformstiffnessfit isinsufficient,the standardmodule willappearjitterandresonance during operation, which willaffecthe positioning accuracy,repetition accuracy and equipment.
2.If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as wellas the numberof lockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan0.02mm/500mm.
4, clean the table to ensure that the installation table is free of foreign bodies, burrs and other items that may hinder the installation.
尺寸示意图
电机型号Motormodel
RGW210-A2-100
| 动子Forcer | RGWA2-100 |
| 电机推力Force | 持续推力429.2N,峰值推力1287.7NThesustainedthrustis429.2N,thepeakthrust is1287.7N |
| 电流Current | 持续电流6A,峰值电流18AContinuouscurrent6A,peakcurrent18A |
| 导轨Guiderail | 15/20(双导轨)15/20(doublerail) |
| 电机最大速度 Maximumspeed | 5m/s |
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)±6um/500mm |
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetitionaccuracy±1umPositioning accuracy(aftercompensation)±2um/5o0mm | |
| 反馈Feedback | 0.5um,1um可选0.5um,1umoptional |
安装要求
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 0.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1, in the standard linear motormodule operation process,the platform willbe subjected to greaterimpact,so the installation platform needsto have sufficient stiffness and stability If the installtion platform stiffnessf it is insufficient, the standardmodule willappear jiter and resonance during operation,which willaffect thepositioning accuracy,repetition accuracy and equipment.
2. If condlitions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the numberof lockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan 0.02mm/500mm
4, clean the table to ensure that the installation table is free of foreign bodies, burrs and other items that may hinder the installation.
尺寸示意图
电机型号Motormodel
RGW210-A3-100
| 动子Forcer | RGWA3-100 |
| 电机推力Force | 持续推力733.2N,峰值推力2199.6NThesustainedthrustis733.2N.thepeakthrustis2199.6N |
| 电流Current | 持续电流6A,峰值电流18Acontinuouscurrent6A,peakcurrent18A |
| 导轨Guiderail | 15/20(双导轨)15/20(doublerail) |
| 电机最大速度 Maximumspeed | 5m/s |
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)±6um/500mm |
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetitionaccuracy±1umPositioning accuracy(aftercompensation)±2um/5o0mm | |
| 反馈Feedback | 0.5um,1um可选0.5um,1umoptional |
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 0.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1. in thestandard linearmotormodule operationprocess,the platform willbe subjected to greater impactso the installtion platformneedstohave sufficient stiffnessandstability.If the installationplatform stiffnesslf it isinsufficientthestandard modulewillappearjitterandresonance during operation,which willaffecthe positioning accuracy,repetition accuracy and equipment.
2.If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the numberof lockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan0.02mm/500mm.
4, clean the table to ensure that the installation table is free of foreign bodies, burrs and other items that may hinder the installation.
尺寸示意图
电机型号Motormodel
RGW210-A1-125
| 参数指标 Parameterindicators | ||||||||||||||||||
| 动子Forcer | RGWA1-125 | |||||||||||||||||
| 电机推力Force | 持续推力261.7N,峰值推力785NThe sustained thrustis261.7N,thepeakthrust is785N | |||||||||||||||||
| 电流Current | 持续电流3A,峰值电流9AContinuouscurrent3A,peakcurrent9A | |||||||||||||||||
| 导轨Guiderail | 15/20(双导轨)15/20(double rail) | |||||||||||||||||
| 电机最大速度 Maximumspeed | 5m/s | |||||||||||||||||
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)±6um/500mm 光栅:重复精度±1um定位精度(补偿后)±2um/500mm | |||||||||||||||||
| 0.5um,1um可选0.5um,1um optional | Grating:Repetition accuracy±1umPositioningaccuracy(aftercompensation)±2um/500mm | |||||||||||||||||
| 反馈Feedback | ||||||||||||||||||
| 有效行程 Effective travel | 100+N*40 | 940980 | 1020 | |||||||||||||||
| 底座长度 | L+150 | |||||||||||||||||
| Base length 总长Total length | ||||||||||||||||||
| D+40 | odule is D+3 | |||||||||||||||||
| 重量Weight 最大总长 Note:The formula for calculating the total | 注明:钢带模组总长计算公式为D+30,行程进制为40,N表示增加的行程段数,80为基准。如:L120模组N=(120-80)/40=1 | gments, and 80 is the basis. For example, module L120 N= (120-80) /40=1 | ||||||||||||||||
| Maximumtotallength | 5000 | |||||||||||||||||
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 *0.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1.in the standard linearmotormodule operation process,the platform willbe subjected to greaterimpact,so theinstallation platform needstohave sufficient stiffnessandstability.f theinstallationplatformstiffnesslf it isinsufficient,thestandardmodulewillappearjitterandresonanceduring operation,which will affect thepositioning accuracy,repetition accuracyandequipment.
2.If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as wellas the number of lock screws.
3,the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan0.02mm/500mm.
尺寸示意图
电机型号Motormodel
RGW210-A2-125
| 动子Forcer | RGWA2-125 |
| 电机推力Force | 持续推力570.4N,峰值推力1711.1NThesustained thrustis570.4N,thepeakthrustis1711.1N |
| 电流Current | 持续电流6A,峰值电流18AContinuouscurrent6A,peakcurrent18A |
| 导轨Guiderail | 15/20(双导轨)15/20(doublerail) |
| 电机最大速度 Maximumspeed | 5m/s |
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)+6um/500mm |
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetition accuracy±1umPositioning accuracy(aftercompensation)±2um/5o0mm | |
| 反馈Feedback | 0.5um,1um可选0.5um,1umoptional |
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 \dot{^{0}}.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1.in the standard linearmotormoduleoperation process,the platform willbe subjected to greaterimpact,so theinstallationplatformneedstohave sufficient stiffness and stability.If the installation plaform stiffnesslf it is insufficient,the standardmodule willappear jiter and resonance during operation,which will affect thepositioning accuracy,repetition accuracyandequipment.
2. If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the numberof lockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm and the occasion with high accuracy requirements needs to be not less than 0.02mm/500mm.
4, clean the table to ensure that the installation table is free of foreign bodies, burrs and other items that may hinder the installation.
尺寸示意图
电机型号Motormodel
RGW210-A3-125
| 动子Forcer | RGWA3-125 |
| 电机推力Force | 持续推力973.8N,峰值推力2921.4NThesustained thrustis973.8N.thepeakthrustis2921.4N |
| 电流Current | 持续电流6A,峰值电流18Acontinuouscurrent6A,peakcurrent18A |
| 导轨Guiderail | 15/20(双导轨)15/20(doublerail) |
| 电机最大速度 Maximumspeed | 5m/s |
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)±6um/500mm |
| 光栅:重复精度±1um定位精度(补偿后)±2um/500mm Grating:Repetitionaccuracy±1umPositioning accuracy(aftercompensation)±2um/5o0mm | |
| 反馈Feedback | 0.5um,1um可选0.5um,1umoptional |
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 0.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1. in the standard linearmotormodule operationprocess,the platform wilbe subjected to greater impactso theinstalltion platform needstohave sufficient stiffnessandstability.If theinstallationplatform stiffnesslf it isinsufficient,thestandardmodule willappearjitterandresonance during operation, which willaffect the positioning accuracy,.repetition accuracy and equipment.
2.If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the numberof lockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan0.02mm/500mm.
4, clean the table to ensure that the installation table is free of foreign bodies, burrs and other items that may hinder the installation.
尺寸示意图
电机型号Motormodel
RGW135B-A1-40
| 参数指标 Parameterindicators | ||||||||||||||||||||
| 动子Forcer | RGWA1-40 | |||||||||||||||||||
| 电机推力Force | 持续推力55.9N,峰值推力167.6NThe sustained thrust is 55.9N,the peak thrustis167.6N | |||||||||||||||||||
| 电流Current | 持续电流3A,峰值电流9AContinuouscurrent3A,peakcurrent9A | |||||||||||||||||||
| 导轨Guiderail | 15(双导轨)15(doublerail) | |||||||||||||||||||
| 电机最大速度 Maximumspeed | 1.6m/s | |||||||||||||||||||
| 电机最大加速度 Maximum acceleration | 1G | |||||||||||||||||||
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)+6um/500mm Magneticgate:repetitionaccuracy±3umPositioning accuracy(aftercompensation)±6um/500mm | |||||||||||||||||||
| 光栅:重复精度+1um定位精度(补偿后)±2um/500mm Grating:Repetition accuracy ±1umPositioning accuracy(after compensation)±2um/500mm | ||||||||||||||||||||
| 反馈Feedback 0.5um,1um可选0.5um,1um optional | ||||||||||||||||||||
| 有效行程 | ||||||||||||||||||||
| Effective travel 底座长度 | 80+N*40 | 1000 | ||||||||||||||||||
| Baselength | L+170 | 290 330370 410 450 490530570 610 650690730 77081085089093097010101050 1090 11301170 | ||||||||||||||||||
| 总长Totallength | D+10 | 300340380420 460500540580620660700740790820860900940980 10201060110011401180 | 1500 | |||||||||||||||||
| 重量Weight 最大总长 Maximumtotallength | 6.46+N*0.647.1 7.748.38 9.02 9.66 10.3 10.9411.5812.2212.8613.5 14.1414.7815.4216.0616.717.3417.9818.6219.26 19.9 20.54 21.18 | |||||||||||||||||||
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 \dot{^{0}}.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1.in the standard linearmotormodule operationprocess,the platform will be subjected to greaterimpact, so theinstallation platformneedstohave sufficientstiffnessandstability.f theinstallationplatformstiffnesslf it isinsufficientthestandardmodulewillappearjiterandresonance during operation,which will affecthepositioning accuracy,repetitionaccuracyand equipment.
2.If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as wellas the numberoflockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm and the occasion with high accuracy requirements needs to be not less than 0.02mm/500mm.
4, cleanthe table to ensure that the installation table is free of foreign bodies,burrs and otheritems that mayhinderthe installation.
尺寸示意图
电机型号Motormodel
RGW135B-A2-40
| 动子Forcer RGWA2-40 | |||||||||||||||||||||
| 电机推力Force | 持续推力117.6N,峰值推力352.8NThe sustained thrust is117.6N,the peakthrustis352.8N | ||||||||||||||||||||
| 电流Current | 持续电流6A,峰值电流18AContinuouscurrent6A,peakcurrent18A | ||||||||||||||||||||
| 导轨Guiderail | 15(双导轨)15(doublerail) | ||||||||||||||||||||
| 电机最大速度 Maximum speed | 2m/s | ||||||||||||||||||||
| 电机最大加速度 Maximumacceleration | 1G | ||||||||||||||||||||
| 精度Precision | 磁栅:重复精度±3um定位精度(补偿后)±6um/500mm Magneticgate:repetitionaccuracy±3umPositioning accuracy(aftercompensation)±6um/500mm | ||||||||||||||||||||
| 光栅:重复精度+1um定位精度(补偿后)±2um/500mm Grating:Repetition accuracy±1umPositioning accuracy(aftercompensation)±2um/500mm | |||||||||||||||||||||
| 反馈Feedback | 0.5um,1um可选0.5um,1umoptional | ||||||||||||||||||||
| 有效行程 120 160200 240280320360 400440 480520560600 640680 720 760800840 Effective travel | 80+N*40 | 880 | 9209601000 | ||||||||||||||||||
| 底座长度 Baselength | L+250 | 37041045049053057061065069073077087085089093097010101050109011301170 12101250 | |||||||||||||||||||
| 总长Totallength | D+10 | 38042046050054058062066070074078082086090094098010201060110011401180 1220 1260 | |||||||||||||||||||
| 重量weight | |||||||||||||||||||||
| 最大总长 | 8.94+N*0.649.58 10.2210.86 11.5 12.1412.7813.4214.0614.7 15.3415.9816.6217.2617.9 18.5419.1819.8220.46 21.121.7422.38 23.02 23.66 1500 Maximumtotallength | ||||||||||||||||||||
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 0.02\mathsf{mm}/500\mathsf{mm}
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1. in the standard linearmotormoduleoperation process,the platform wilbe subjected to greaterimpact so the installation plaformneedstohave sufficient stiffnessandstability.If theinstallationplatformstiffnesslf it isinsufficient,thestandardmodule willappearjitter andresonance during operation, which willaffect the positioning accuracy,repetition accuracyand equipment.
2.If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the numberof lockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan0.02mm/500mm.
4, clean the table to ensure that the installation table is free of foreign bodies, burrs and other items that may hinder the installation.
尺寸示意图
Dimensional diagram
电机型号Motormodel
RGW135B-A3-40
| 动子Forcer | RGWA3-40 | |||||||||||||||||||||
| 电机推力Force 电流Current | 持续推力200N,峰值推力600NThesustained thrust is200N,thepeakthrust is600N 持续电流6A,峰值电流18Acontinuouscurrent6A,peakcurrent18A | |||||||||||||||||||||
| 导轨Guide rail | ||||||||||||||||||||||
| 电机最大速度 | 15(双导轨)15(doublerail) 2m/s | |||||||||||||||||||||
| Maximumspeed 电机最大加速度 | 1G | |||||||||||||||||||||
| Maximumacceleration | 磁栅:重复精度±3um定位精度(补偿后)+6um/500mm | |||||||||||||||||||||
| 精度Precision 反馈Feedback | Magneticgate:repetitionaccuracy±3umPositioningaccuracy(aftercompensation)±6um/500mm 光栅:重复精度+1um定位精度(补偿后)±2um/500mm | |||||||||||||||||||||
| Grating:Repetitionaccuracy±1umPositioning accuracy(aftercompensation)±2um/500mm 0.5um,1um可选0.5um,1umoptional | ||||||||||||||||||||||
| 有效行程 Effective travel | 80+N*40 | 120 160200 240280320360 400440480520560 600 640680720 7608008408809209601000 | ||||||||||||||||||||
| 底座长度 | L+330 | 450 490530 570 610650690 730770 810850890 930 970 101010501090113011701210 1250 1290 1330 | ||||||||||||||||||||
| Baselength 总长Total length | ||||||||||||||||||||||
| D+10 | 460500540 580 620660700 740780820860900 940980 102010601100114011801220 1260 1300 1340 | |||||||||||||||||||||
| 重量Weight 最大总长 Maximumtotallength | 12.06+N*0.6412.7 13.3413.9814.6215.26 15.9 16.5417.1817.8218.4619.119.7420.3821.0221.6622.3 22.9423.5824.22 24.8625.5 26.14|26.78 1500 | |||||||||||||||||||||
安装要求
Installation requirements
1、在标准直线电机模组运行过程中,平台会受到较大的冲击力,因此安装平台需要具备足够的刚度与稳定性。若安装平台刚度
不足,则标准模组在运行过程中会出现抖动、共振等现象,从而产生对定位精度、重复精度以及设备的影响。
2、在条件允许的情况下,应尽可能多的增加模组底座与安装台面的接触面积,以及锁螺钉的数量。
3、安装平台的台面平整度不低于 0.05\mathsf{mm}/500\mathsf{mm} ,对于精度要求高的场合需不低于 \left.0.02\mathsf{mm}/500\mathsf{mm}\right.
4、清理台面,确保安装台面无异物、毛刺等可能妨碍安装的物品。
1.in the standard linearmotormodule operation process,theplatform willbe subjectedtogreaterimpact so the installation platformneedstohave sufficient stiffnessandstability.If theinstallationplatform stiffnesslf it isinsufficient,the standardmodule willappearjitter andresonance during operation, which willaffect the positioning accuracy,repetition accuracy and equipment.
2.If conditions permit, the contact area between the module base and the installation table should be increased as much as possible, as well as the numberof lockscrews.
3, the tabletop flatness of the installation platform is not less than 0.05mm/500mm, and the occasion with high accuracy requirements needs to be not lessthan0.02mm/500mm.
4, clean the table to ensure that the installation table is free of foreign bodies, burrs and other items that may hinder the installation.
尺寸示意图




